Active Solicitation · DEPARTMENT OF AGRICULTURE

    12445126B0011 NFSR 205 Pavement Reconstruction LOUISIANA

    Sol. 12445126B0011Combined Synopsis/SolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)Atlanta, GA
    Open · 7d remaining
    DAYS TO CLOSE
    7
    closes Apr 30, 2026
    POSTED
    Apr 22, 2026
    Publication date
    NAICS CODE
    237310
    Primary industry classification
    PSC CODE
    Z2LB
    Product & service classification

    AI Summary

    The NFSR 205 Pavement Reconstruction project in Louisiana is set aside for small businesses and involves comprehensive road repair services. The contractor will be responsible for all materials and labor to restore the roadway. The bid submission deadline is April 30, 2026, with a project magnitude between $2,000,000 and $3,000,000.

    Contract details

    Solicitation No.
    12445126B0011
    Notice Type
    Combined Synopsis/Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    April 22, 2026
    Response Deadline
    April 30, 2026
    NAICS Code
    237310AI guide
    PSC / Class Code
    Z2LB
    Contract Code
    12C2
    Issuing Office
    USDA-FS, CSA EAST 11
    Sub-Agency
    FOREST SERVICE
    Primary Contact
    Adam Doyle
    State
    GA
    ZIP Code
    303092449
    AI Product/Service
    service

    Description

    Amendment 003 Site Visit Details for 03/25/2026, 0930CT, 799H+RJ, Alexandria, LA 71409, POC Robert Wilson robert.wilson3@usda.gov / 318-452-1442; RSVP Requested! Amendment 002 Questions and Answers - Specifications Clarification Amendment 001 Updated to Pay Items /Reposting of Legible Plans Project Title: NFSR 205 Pavement Reconstruction LOUISIANA Original Set Aside: The project is set-aside 100% for small businesses per FAR 19.5. NAICS Code: 237310 - Highway, Street, and Bridge Construction (size standard $45m). PSC: Z2LB - Repair Of Highways, Roads, Streets, Bridges, And Railways. Magnitude: Between $2,000,000 and $3,000,000. Location: Kincaid Recreation Area, Calcasieu Ranger District, Kisatchie National Forest, (Rapides Parish, LA). See Attachment 003 Statement of Work for specific location. Scope of Work (summarized): See Attachment 003 Statement of Work for specific details not included under this paragraph. The contractor shall supply all material, labor, tools, equipment, supplies, incidentals, supervision, and safety measures necessary to complete this project. Project includes removal of failed materials, base stabilization, resurfacing, compaction and finishing to restore NFSR 205 Roadway to its original condition. Award of Task Order: A single award will be made to the overall lowest priced responsive/responsible bidder. Tentative Dates: Site(s) Visit/Pre-Bid Conference (if needed): 03/25/2026 - POC Robert Wilson robert.wilson3@usda.gov Date for Questions: 04/20/2026. Bid Submittal Deadline: 04/30/2026, 1300 CT. - NOTE: Bid Bond is required Delivery: 120 Days After Notice to Proceed Period of Performance: 120 Days After Notice to Proceed Submittal Method: All proposals will be emailed to adam.doyle@usda.gov and cc steven.alves@usda.gov You may email to confirm receipt.

    Key dates

    1. April 22, 2026Posted Date
    2. April 30, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    12445126B0011 NFSR 205 Pavement Reconstruction LOUISIANA is a federal acquisition solicitation issued by DEPARTMENT OF AGRICULTURE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.