Closed Solicitation · DEPT OF DEFENSE

    15KV SWITCHGEAR & STATION SERVICE REPLACEMENT AT LAKE TENKILLER, OK

    Sol. W912BV26RA032PresolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)TULSA, OK
    Closed
    STATUS
    Closed
    POSTED
    Jul 6, 2026
    Publication date
    NAICS CODE
    238210
    Primary industry classification
    PSC CODE
    Y1NZ
    Product & service classification

    AI Summary

    This pre-solicitation notice is for the construction of a 15kV switchgear and station service replacement at Lake Tenkiller, Oklahoma. The project includes the removal and installation of various electrical components and is set aside for small businesses. The estimated construction cost ranges from $5 million to $10 million, with a duration of 900 days.

    Contract details

    Solicitation No.
    W912BV26RA032
    Notice Type
    Presolicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    July 6, 2026
    Response Deadline
    NAICS Code
    238210AI guide
    PSC / Class Code
    Y1NZ
    Issuing Office
    W076 ENDIST TULSA
    Primary Contact
    Tyler Godwin
    City
    TULSA
    State
    OK
    ZIP Code
    74137-4290
    AI Product/Service
    service

    Description

    Pre-solicitation Notice

    For

    15kV Switchgear & Station Service Replacement

    at Lake Tenkiller, OK

    This is a PRE-SOLICITATION NOTICE for the construction of a 15kV Switchgear & Station Service Replacement at Lake Tenkiller, in Oklahoma. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS SYNOPSIS.  No reimbursement will be made for any costs associated with providing information in response to this pre-solicitation notice or any follow up postings.

    The U.S. Army Corps of Engineers – Tulsa District has been tasked to solicit for and award a contract to perform the 15kV Switchgear & Station Service Replacement at Lake Tenkiller, Oklahoma. The proposed design-bid-build project will be procured as a Small Business Set-Aside, firm-fixed price contract in accordance with Revolutionary FAR Overhaul (RFO) Part 15, Negotiated Procurement, using the Lowest Price Technically Acceptable approach. Tradeoffs will not be permitted.

    Project Description:

    The work includes Replace the three existing 15kV switchgear lineups for the generator breakers and station service transformer feeder breakers.

    • Removal of existing 500 kVA, 13.8 kV/480V station service transformer
    • Removal of existing 15 kV switchgear and breakers located beneath control room
    • Removal of 480V station service switchgear in control room
    • Removal of the existing 15kV cables to the switchyard
    • Removal of existing potheads for the 15kV cable transition to switchyard bus
    • Removal of the existing asbestos cable trays containing 15kV cables in cable tunnel
    • Installation of new 15kV cables to the switchyard
    • Installation of new potheads for the 15kV cable transition to switchyard bus
    • Installation of new cable trays containing the new 15kV cables in cable tunnel
    • Installation of front accessible double-ended 480V switchgear beneath control room with feeder

    circuit breakers

    • Installation of 15kV switchgear with new vacuum circuit breakers and redundant 500 kVA

    13.8kV/480V, high-resistance grounded wye station service transformers

    • Reconfiguration of project diesel generator to wye-grounded with high-resistance grounding

    resistor.

    • New control and annunciation wiring for new 480V and 15kV switchgear where existing cables

    are not reused.

    • Modifications to protective relay settings and new protection relays for the new station service

    feeders.

    • Automatic transfer functionality for the 480V switchgear main & tie breakers, along with local arc

    flash mitigation switches.

    • Replacement and relocation of existing Lighting Transformer

    The estimated magnitude of construction for this project is between $5,000,000 and $10,000,000.

    The North American Industrial Classification System (NAICS) Code for this procurement is 238210, Electrical Contractors and Other Wiring Installation Contractors, which has a small business size standard of $19M.

    The Product Service Code is: Y1NZ (Construction of Other Utilities)

    Estimated duration of construction of this project is 900 calendar days.

    Anticipated solicitation issuance date is on or about 20 July 2026, and the estimated proposal due date will be on or about 19 August 2026.

    Key dates

    1. July 6, 2026Posted Date

    AI search tags

    Frequently asked questions

    15KV SWITCHGEAR & STATION SERVICE REPLACEMENT AT LAKE TENKILLER, OK is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.