Closed Solicitation · DEPARTMENT OF ENERGY

    ALS LEAD SHIELDING PANELS

    DEPARTMENT OF ENERGY
    Sol. JS-2025-003SolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)Berkeley, CA
    Closed
    STATUS
    Closed
    closed Jul 9, 2025
    POSTED
    Jun 27, 2025
    Publication date
    NAICS CODE
    332312
    Primary industry classification
    PSC CODE
    AJ15
    Product & service classification

    AI Summary

    The Department of Energy is soliciting proposals for ALS lead shielding panels, with a proposal due date extended to July 9, 2025. Recent amendments have revised several documents, clarified that only one award will be made for the complete lot, and added consultation services during installation. The design drawings are currently at 95% completion, and project management support will be offered as an option post-delivery. Interested bidders should ensure they include the latest documents in their submissions.

    Contract details

    Solicitation No.
    JS-2025-003
    Notice Type
    Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    June 27, 2025
    Response Deadline
    July 9, 2025
    NAICS Code
    332312AI guide
    PSC / Class Code
    AJ15
    Primary Contact
    Arielle Anoop
    State
    CA
    ZIP Code
    94720

    Description

    Amendment 2 is hereby issued to this RFP on June 27, 2025 to:

    1. Revise "06 AL-1790-6401A ALS-U SR New Lead Panel Structural Steel Sheet List" to DRAFT REV. B

    2. Revise "08 AL-1791-1369B Statement of Work" to DRAFT REV. C

    3. Revise "09 Attachment A ALS Lead Shielding Panel Pricing and Delivery Matrix" to REV. 1 

    *PLEASE ENSURE Attachment A REV. 1 is the document included with you finalized RFP submission*

    4. Revise "10 Sample SubK Lead Shielding Panels" to REV. 1

    5. Add "ALS Lead Shielding - Basis of Design AL-1816-3759"

    *The DRAFT Documents noted above are presently routing through LBNL internal approvals process and are not anticipated to change under a finalized award.

    Below is a brief summary of the specific changes to the Statement of Work:

    1. Removed the potential for a (2) batch or (2) award approach. LBNL now intends to make (1) award for the complete lot of panels.

    2. Addition of consultation services during installation.

    3. Updates to the schedule. 

    4. Clarified that the current drawings are at the 95% design stage.

    5 . Minor language clarifications throughout.

    All other terms of this RFP remain the same.

    __________________________________________________________________________

    Amendment 1 is hereby issued to this RFP on June 10, 2025 to extend the Proposal Due Date until July 9, 2025.

    An Amendment 2 will be issued on or about June 27, 2025 to accomplish the following 2 Items in additional detail:

    Item 1) Clarify that the design drawing set provided by LBNL is currently at 95% completion, not 100%. LBNL will issue 100% drawings based on subcontractor recommendations as described in SOW Section 3.2.1.1. Additionally, the panel widths in the 100% drawings may increase or reduce in size by up to 1” based on as-built measurements being performed by LBNL; height and thickness of the panels will remain unchanged.  

    Item 2) Add project management support scope - to be further defined in the revised SOW - as a priced option after panel delivery. This support would cover consultation during installation and panel handling & storage requirements.

    __________________________________________________________________________

    Changed Primary Point of Contact to Arielle Anoop.  June 23, 2025

    Adding Vendor Q & A 6 from Vendor Drawing Meeting June 9 , 2025 please reference attachments

    Adding Video of Vendor Drawing only questions June 4, 2025 please reference attachments

    Vendor Q&A Question 5 is added as of June 3, 2025 - please reference attachments

    Vendor Q&A Question 4 is added as of May 21, 2025 - please reference attachments

    Vendor Q&A Questions 2 & 3 are added as of May 20, 2025 - Please reference attachments

    Vendor Q&A Question 1 is added as of May 14, 2025 - please reference attachments

    __________________________________________________________________________

    Project Definition – ALS-U Storage Ring Lead Panel Shielding


    Completion of 95% Drawings. Fabricate and install new lead panels to the inside face of the storage ring outer precast walls to 
    improve radiation shielding performance. This project is part of the Advanced Light Source.  Upgrade storage ring shielding. The structural design and anchorage detailing for the new lead shielding panels is based on the current ASCE 7-16, California Building Code (CBC), 2019  edition, Part 10 (California Existing Building Code, University of California Seismic Safety Policy, Geotechnical Data and Interpretation Report and Site-Specific Seismic Hazard Analyses and Development of Design Ground Motions Report. The seismic analysis and retrofit design of the existing structure have been performed in a previous task. The design considers the combination of gravity and seismic loading resisted by the anchorage to the precast walls. 

    Please reference attached documetation for additional infromation.
     

    Key dates

    1. June 27, 2025Posted Date
    2. July 9, 2025Proposals / Responses Due

    Frequently asked questions

    ALS LEAD SHIELDING PANELS is a federal acquisition solicitation issued by DEPARTMENT OF ENERGY. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.