Active Solicitation · DEPARTMENT OF TRANSPORTATION

    AUTOMATIC ENGINE START STOP (AESS) CONTINUATION AND AIR LEAK FUEL PENALTY STUDY

    Sol. FR26RDI20000000033Special NoticeWASHINGTON, DC
    Open · 21d remaining
    DAYS TO CLOSE
    21
    closes May 14, 2026
    POSTED
    Apr 23, 2026
    Publication date
    NAICS CODE
    541715
    Primary industry classification
    PSC CODE
    AJ12
    Product & service classification

    AI Summary

    The Federal Railroad Administration intends to award a sole-source contract to Southwest Research Institute for a study on the fuel and emissions penalties of the Automatic Engine Start Stop system due to air leaks. Interested parties may submit capability statements by June 15, 2026, to demonstrate their ability to perform the study.

    Contract details

    Solicitation No.
    FR26RDI20000000033
    Notice Type
    Special Notice
    Posted Date
    April 23, 2026
    Response Deadline
    May 14, 2026
    NAICS Code
    541715AI guide
    PSC / Class Code
    AJ12
    Primary Contact
    Akwasi Kankam
    State
    DC
    ZIP Code
    20590
    AI Product/Service
    service

    Description

    FR26RDI20000000033 - NOTICE OF INTENT TO AWARD A SOLE SOURCE CONTRACT

    THIS IS A NOTICE OF INTENT (NOI) TO AWARD A SOLE SOURCE CONTRACT AND IS NOT A REQUEST FOR COMPETITIVE PROPOSALS.

    The Federal Railroad Administration (FRA) intends to award a sole-source contract to Southwest Research Institute to identify the fuel and emissions penalty of the Automatic Engine Start Stop (AESS) system not being able to keep the locomotive shutdown due to air leaks. This is in addition to the available information on the fuel consumption and emissions penalty associated with the addition of a simulated break pipe air leak of 30 and 60 Standard Cubic Foot per Minute (SCFM) as a follow-on requirement to continue work previously performed  by Southwest Research Institute under Contract No. (693JJ623C000028) during the base performance period.

    The previous contract only identified the fuel penalties associated with the line haul and switcher duty cycles during continuous operation but did not identify the penalty associated with the additional time that the Locomotive Automatic Engine Start Stop (AESS) system needs to operate the engine to maintain the air pressure in the Main Reservoir (MR).

    AUTHORITY

    This sole source action is conducted under the authority of FAR 6.302‑1, implemented by 41 U.S.C. § 3304(a)(1), Only One Responsible Source.” No solicitation or request for quote is available.

    PERIOD OF PERFORMANCE

    June 30, 2026 - June 29, 2028

    RESPONSE INSTRUCTIONS

    This Notice of Intent is not a request for competitive proposals; however, interested parties may submit a capability statement that clearly demonstrates the ability to perform the Automatic Engine Start Stop (AESS) continuation and Air Leak Fuel Penalty Study without disruption, duplication of cost, or loss of program continuity. Capability statements must be received no later than 15 calendar days from the date of posting, by 2:00 PM Eastern Time. Oral communication will not be accepted.

    Key dates

    1. April 23, 2026Posted Date
    2. May 14, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    AUTOMATIC ENGINE START STOP (AESS) CONTINUATION AND AIR LEAK FUEL PENALTY STUDY is a federal acquisition solicitation issued by DEPARTMENT OF TRANSPORTATION. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.