Closed Solicitation · DEPARTMENT OF TRANSPORTATION

    AZ FLAP PIM FR510(1) SABINO CANYON PARK

    Sol. 6982AF25B000006SolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)LAKEWOOD, CO
    Closed
    STATUS
    Closed
    closed Aug 26, 2025
    POSTED
    Aug 22, 2025
    Publication date
    NAICS CODE
    237310
    Primary industry classification
    PSC CODE
    Y1LB
    Product & service classification

    AI Summary

    This project involves the construction of a new paved parking lot with 75 spaces, a kiosk, a public restroom, and improvements to Sabino Canyon Park Road. Key tasks include roadway excavation, retaining wall construction, and drainage enhancements. The estimated project cost ranges from $5 million to $10 million, with advertisement in July 2025 and completion by May 2026.

    Contract details

    Solicitation No.
    6982AF25B000006
    Notice Type
    Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    August 22, 2025
    Response Deadline
    August 26, 2025
    NAICS Code
    237310AI guide
    PSC / Class Code
    Y1LB
    Primary Contact
    Eric Grosskreuz
    State
    CO
    ZIP Code
    80228
    AI Product/Service
    both

    Description

    TOTAL SMALL BUSINESS SET-SIDE

    This project includes the construction of a new paved parking lot consisting of approximately 75 parking spaces, a kiosk for Arizona Trail information, a public restroom, and the improvement of Sabino Canyon Park Road to accommodate approximately 21 new on-street parking spaces, an asphalt surface rehabilitation for approximately half a mile, and the installation of a 5-foot-wide pathway as part of the Arizona Trail. The project improvements will provide a new paved surface, roadway excavation, retaining wall construction, tree clearing, ditch construction/reconditioning to improve drainage, installation of culverts, a new public bathroom, and the installation of new street signage and pavement marking.

    PRINCIPAL WORK ITEMS:

    20401-0000 Roadway Excavation: 7,000 CUYD

    25902-0000 Soil Nail Retaining Wall: 8,200 SQFT

    30202-2000 Roadway Aggregate, Method 2: 1,800 TON

    40301-0100 Asphalt Concrete Pavement, Type 1: 1,800 TON

    60202-0600 36-Inch Equivalent Diameter Arch Pipe Culvert: 180 LNFT

    60901-1700 Curb Concrete, 18-Inch Depth: 1,200 LNFT

    60906-1000 Gutter, Concrete (Ditch): 750 SQYD

    61501-0800 Sidewalk, Concrete: 1,100 SQYD

    63501-0000 Temporary Traffic Control: LPSM

    64603-1000 Fixture, Vault Toilet: 2 EACH

    ANTICIPATED SCHEDULE: 

    Advertisement – July 2025

    Award – September 2025

    NTP – September 2025

    Contract Completion – May 2026

    The estimated price range of the project work is between $5 million and $10 million.

    Key dates

    1. August 22, 2025Posted Date
    2. August 26, 2025Proposals / Responses Due

    AI search tags

    Frequently asked questions

    AZ FLAP PIM FR510(1) SABINO CANYON PARK is a federal acquisition solicitation issued by DEPARTMENT OF TRANSPORTATION. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.