Active Solicitation · DEPT OF DEFENSE

    Battery Energy Storage System (BESS) Relocation

    Sol. W50S8D26QA015Combined Synopsis/SolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)NEWBURGH, NY
    Open · 1d remaining
    DAYS TO CLOSE
    1
    closes Aug 6, 2026
    POSTED
    Jul 27, 2026
    Publication date
    NAICS CODE
    488510
    Primary industry classification
    PSC CODE
    V119
    Product & service classification

    AI Summary

    The Department of Defense is seeking contractors for the relocation of a Generac Model SBE500 Battery Energy Storage System from Dover AFB to Stewart ANGB. The contractor must handle all loading and offloading without government-supplied equipment. This is a first-time requirement with no incumbent contractor.

    Contract details

    Solicitation No.
    W50S8D26QA015
    Notice Type
    Combined Synopsis/Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    July 27, 2026
    Response Deadline
    August 6, 2026
    NAICS Code
    488510AI guide
    PSC / Class Code
    V119
    Contract Code
    2100
    Primary Contact
    Kevin Fenner
    State
    NY
    ZIP Code
    12550-5042
    AI Product/Service
    service

    Description

    27 July 2026 -Edited to add Questions and Answers. 21 July 2026 -Edited to add Questions and Answers. 21 July 2026 - Edited to add Wage Determination. There is NO incumbent contractor or existing contract in place for this requirement. This is a first time requirement. Relocation of a Generac Model SBE500 Battery Energy Storage System (BESS) from a contractor storage lot in the vicinity of Dover Air Force Base (AFB), Delaware, to a designated site at Hanger 101, Stewart Air National Guard Base (ANGB), New York. Contractor will be responsible for, but not limited to: visually inspecting BESS and documenting, load and transfer BESS to 12550, off load BESS on dunnage provided by the contractor for BESS to ensure no damage to the ground surface. All other requirements for this project are listed in the attached Performance Work Statement (PWS). I've also attached a picture of the BESS and the spec sheets. NOTE: the contractor is responsible for loading and offloading the BESS. The government will NOT supply a crane, forklift, or any other means to perform this task. Loading and offloading the BESS is the responsibility of the contractor.

    Key dates

    1. July 27, 2026Posted Date
    2. August 6, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    Battery Energy Storage System (BESS) Relocation is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.