Closed Solicitation · DEPT OF DEFENSE
AI Summary
The Department of Defense is soliciting proposals for the purchase and installation of Battery Energy Storage Systems (BESS) in Longare, Italy. The estimated construction magnitude is between $500,000 and $1,000,000. Proposals are due by September 22, 2025, at 1100. Amendments have been issued to clarify submission requirements and update the Statement of Work.
Amendment 0005: THE PURPOSE OF THIS AMENDMENT IS TO INCORPORATE REVISED ADDENDUM 52.212-2
________________________________________________________________________________________________
The purpose of this update to SAM is to add back in the Record of Environmental Consideration labeled, "B08-RFP_Atch1.8_SOW_REC - BESS at Longare Proponent Signed_20250725"
_______________________________________________________________________________________________
Amendment 0004:
The purpose of this Amendment is to:
1. Specify the estimated construction magnitude: Between $500,000 and $1,000,000 [FAR 36.204(e)]
2. Incorporate a Performance Bond requirement
3. Add Clause 52.228-15 Performance and Payment Bonds-Construction
4. Change the proposal due date from 18 September 2025 at 1500 to 22 September 2025 at 1100
5. Clarify submission requirements for Volume IV, Factor III - Past Performance
6. Clarify submission formatting for Attachment 4, Bid Schedules
7. Clarify submission requirements for Representations and Certifications
8. Clarify page limit requirements for Volume II: Technical Approach
9. Remove attachment B08-RFP_Atch4_BidSchedule_20250804
10. Update Statement of Work (SOW) from A02-SOW_20250725 to A02-SOW_R1_20250911
11. Incorporate the following attachments:
1) B08-RFP_Atch3_QA LOG_MASTER_20250912
2) B08-RFP_Atch4_BidSchedule_CLIN0001_20250904
3) B08-RFP_Atch4_BidSchedule_CLIN0002_20250904
4) B08-RFP_Atch4_BidSchedule_CLIN0003_20250904
5) B08-RFP_Atch4_BidSchedule_CLIN0004_20250904
6) B08-RFP_Atch6_SS_44_PLC ABB
7) B08-RFP_Atch7_SS_44_RTU_MULTIFILARE
8) B08-RFP_Atch8_T601-Smart Grid As-Built
9) A02-SOW_R1_20250911
12. Update Clause 52.211-10 Commencement, Prosecution, and Completion of Work.
___________________________________________________________________________________________________
Amendment 0003
THE PURPOSE OF THIS AMENDMENT IS TO:
1. REVISE ADDENDUM TO FAR 52.212-1, GENERAL INSTRUCTIONS, SECTION (A), PARAGRAPH (8)
2. REVISE ADDENDUM TO FAR 52.212-1, VOLUME CONTENT, VOLUME I, PARAGRAPH (E)
____________________________________________________________________________________________________
Amendment 0002
THE PURPOSE OF THIS AMENDMENT IS TO:
1. REVISE ADDENDUM TO FAR 52.212-1, VOLUME I, PARAGRAPH (E)
2. REVISE ADDENDUM TO FAR 52.212-2, PARAGRAPH (B)
All other terms and conditions of the solicitation remain unchanged unless specifically modified by this or subsequent amendments.
_______________________________________________________________________________________________________
Amendment 0001: This amendment is issued to modify the solicitation as follows:
1) Correct CLIN 0005: The estimated quantity for CLIN 0005, 'Site Clearing and Preparation', is decreased from 1,040 cubic meters (m3) to 260 cubic meters (m3). The revised calculation is based on 65m3 per plot for four (4) plots, for a total of 260m3.
2) Update Product Service Code (PSC): The Product Service Code on the solicitation's cover page is changed from PSC 6130 to PSC 6140, 'Rechargeable Batteries.'
3) Add Attachments to the Statement of Work (SOW): The following eight (8) attachments, which are integral to the Statement of Work, are hereby added to the solicitation and are now available for download on the official SAM.gov solicitation page:
Attachment 1: Design BESS at ESS#34
Attachment 2: Design BESS at ESS#38
Attachment 3: Design BESS at ESS#42
Attachment 4: Design BESS at ESS#43
Attachment 5: MC N.019-24 LO LANDSCAPE
Attachment 6: MC N.019-24 LO PAESAGGISTICA
Attachment 7: REC - Battery Energy Storage System (BESS) at Longare
Attachment 8: MIOTTO BASE GENERATORS+PV
All other terms and conditions of the solicitation remain unchanged unless specifically modified by this or subsequent amendments.
Purchase of Battery Energy Storage Systems (BESS) units with installation in Longare, Italy
BATTERY ENERGY STORAGE SYSTEMS (BESS) is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.
SamSearch Platform