Active Solicitation · DEPARTMENT OF AGRICULTURE
AI Summary
The Black Creek Trail Restoration Project aims to restore approximately 29 miles of trail to standard hiking width using mechanical and manual methods. The solicitation is open for bids, with evaluation based on price and technical acceptability. The project period is from October 5, 2026, to December 30, 2026.
This solicitation is ammended to add C05a_Black Creek Trail .kmz files and C05b_Questions document.
Restore approximately 29 miles of the non-wilderness portion of the Black Creek Trail Restoration Project (BCT) to standard hiking trail width (60 inches), using mechanical and manual methods as described in the attachments.
Period of Performance: 10/05/2026 to 12/30/2026
This is a new requirement there is no incumbent.
No site visit is scheduled. Trail is open to the public. It is recommended that potential offerors visit the trail to fully understand the requirement.
Evaluation Factors: Price (Completed SF 1449), Technical Proposal, Past Performance
Evaluation Method
The Government will evaluate quotations based on the lowest price technically acceptable criteria. Only the lowest priced offer will be evaluated for Technical Acceptability. Should the lowest priced offer not receive an acceptable technical or past performance rating, the process will continue in order of lowest priced offer until the lowest price, technically acceptable offer with acceptable or
neutral past performance is identified.
BLACK CREEK TRAIL RESTORATION PROJECT - DE SOTO RD - MS is a federal acquisition solicitation issued by DEPARTMENT OF AGRICULTURE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.