Closed Solicitation · DEPT OF DEFENSE

    BUCKLEY, SFB - RESTRIPE SPEED HUMPS AND CROSSWALKS - 16 SEPT 2025

    Sol. FA2543-Q0001Sources SoughtSet-aside: Total Small Business Set-Aside (FAR 19.5)BUCKLEY AFB, CO
    Closed
    STATUS
    Closed
    closed Sep 18, 2025
    POSTED
    Sep 16, 2025
    Publication date
    NAICS CODE
    237310
    Primary industry classification
    PSC CODE
    Y1LB
    Product & service classification

    AI Summary

    Buckley Space Force Base requires a contractor for striping and signage of crosswalks and speed humps. The work includes new striping, restriping, and installation of signage in compliance with the Manual on Uniform Traffic Control Devices (MUTCD). Interested parties should refer to the attached Statement of Work for detailed requirements.

    Contract details

    Solicitation No.
    FA2543-Q0001
    Notice Type
    Sources Sought
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    September 16, 2025
    Response Deadline
    September 18, 2025
    NAICS Code
    237310AI guide
    PSC / Class Code
    Y1LB
    Issuing Office
    FA2543 460 CONS
    Primary Contact
    Brandon Lewis
    State
    CO
    ZIP Code
    80011-9572
    AI Product/Service
    service

    Description

    Buckley Space Force Base located in Aurora, Colorado is in need of a contractor to provide all labor, materials, equipment, transportation, and supervision necessary to perform striping, restriping and signage of the crosswalks and speed humps shown in the attached exhibits.

    1.0 Striping

    The Contractor shall provide new striping for all crosswalk locations that do not currently have striping per the figures in the included Attachment A in compliance with the requirements of the Manual on Uniform Traffic Control Devices (MUTCD). Existing crosswalks that are excessively worn or partially effaced will be stripped and restriped. The contractor shall place crosswalk markings and stop bars in accordance with (IAW) the MUTCD.

    The Contractor shall provide new pavement marking layouts, for all required areas, for approval prior to starting striping operations.

    2.0 Signage

    The Contractor shall install crosswalk signage IAW the MUTCD at all new crosswalk locations as well as existing crosswalks that do not have the appropriate signage. If satisfactory signage exists at a location, the contractor does not need to provide or install signage for that location.

    The Contractor shall field verify all Government provided measurements at the area(s) of work to provide a firm fixed price proposal.

    Please see the attached Statement of Work dated 16 SEPT 2025 for all information. 

    Please don't hesitate to reach out to me at jaisen.brown@spaceforce.mil if you have any questions or concerns relating to the project. 

    Key dates

    1. September 16, 2025Posted Date
    2. September 18, 2025Proposals / Responses Due

    AI search tags

    Frequently asked questions

    BUCKLEY, SFB - RESTRIPE SPEED HUMPS AND CROSSWALKS - 16 SEPT 2025 is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.