Active Solicitation
AI Summary
The opportunity involves the complete renovation of Building 107 at the Charlestown Navy Yard in Boston, MA. The project includes historic building envelope work and full interior renovation for multi-departmental occupancy, aiming for LEED certification. A pre-proposal conference and site visit are scheduled for April 2026, with registration required for attendance.
The contractor shall provide for any and all provisions to include but not limited to complete renovation of the National Parks Service (NPS) Building 107 at the Charlestown Navy Yard (CNY) in Boston, MA. It is a three story, 60,000SF masonry structure constructed in 1904 to house the CNY drafting offices and maintenance shop. The project will renovate the entire structure including building envelope work consistent with historic standards (repointing, roof deck and insulation, slate roofing, skylights, copper gutters and downspouts, windows) and full interior renovation to repurpose the building for multi-departmental NPS office occupancy, to include all systems (MEP & HVAC). The project will be pursuing LEED certification (level TBD). The building will be unoccupied for the duration of the renovation project.
Pre-Proposal Conference
Date: April 14th, 2026 Time: 10:00am
Join with Google Meet
meet.google.com/yzy-dqiy-rcd
Join by phone
(US) +1 219-250-1839 PIN: 968 423 289#
Site Visit
Date: April 16th, 2026
Time: 9:00am and 1:00PM EST
Location: BLDG 107, Charlestown Naval Shipyard, Boston, MA
Please be advised of the upcoming site visit. To attend, you must register by April 15th, 2026, by filling out the google sheet below.
Register here: https://forms.gle/2B2CtpjxpXSA2qFb7
If you are having any issues with this link, please email vanessa.colquitt@gsa.gov.
Please note that attendance is limited to a maximum of two people per company. Subcontractors are considered separate entities and do not count toward the general contractor’s limit.
Please be advised that parking will not be permitted at the Naval Shipyard. We ask that you use the surrounding public parking facilities instead.
BUILDING 107 CONSTRUCTION PROJECT AT THE CHARLESTOWN NAVY YARD (CNY) IN BOSTON, MA is a federal acquisition solicitation. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.