Closed Solicitation · DEPARTMENT OF TRANSPORTATION

    CA FLAP MOD 258(1) BLUE LAKE ROAD

    Sol. 6982AF25R000017SolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)LAKEWOOD, CO
    Closed
    STATUS
    Closed
    closed Oct 23, 2025
    POSTED
    Oct 22, 2025
    Publication date
    NAICS CODE
    237310
    Primary industry classification
    PSC CODE
    Y1LB
    Product & service classification

    AI Summary

    The project involves rehabilitating Blue Lake Road and associated roads to improve safety and access to recreational facilities. Key tasks include roadway rehabilitation, rockfall hazard mitigation, and drainage improvements. Offerors must submit a price for the first Task Order, with the intent to award based on the lowest price. This opportunity is part of a MATOC RFP.

    Contract details

    Solicitation No.
    6982AF25R000017
    Notice Type
    Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    October 22, 2025
    Response Deadline
    October 23, 2025
    NAICS Code
    237310AI guide
    PSC / Class Code
    Y1LB
    Primary Contact
    Eric Grosskreuz
    State
    CO
    ZIP Code
    80228
    AI Product/Service
    both

    Description

    Blue Lake Road (CR 258) provides access to Blue Lake and its associated recreational facilities within the Warner Mountain Ranger District of the Modoc National Forest (MNF). The purpose of the project is to address safety concerns and improve access to recreational opportunities at Blue Lake by rehabilitating two sections of rockfall hazards on CR 64, 6.6 miles of CR 258, and 1.5 miles of Campground Road. The two locations along CR 64 that pose rockfall and slope failure hazards are located 4.6 miles east of the town of Likely, California, and about 3.4 miles farther east. Rehabilitation of CR 258 is from the intersection of CR 64 near the Pit River bridge and extends 6.6 miles to Campground Road, and then another 1.5 miles southwest to the campground loop at Blue Lake.


    The project includes roadway rehabilitation (pulverizing and asphalt surfacing), two short segments of reconstruction, rockfall hazard mitigation, and drainage improvements. Roadway improvements will maintain the current width of 20’ and 22’ feet on CR 258 and CR 64 in the rockfall areas and preserve the existing width on Campground Road.


    Work will stay within the current road prism and maintained roadside ditch, except where guardrail and culverts need replacement. The project also includes minor horizontal alignment and profile adjustments, mitigating rockfall hazards, installing guardrail, roadway subexcavation, replacing culverts, reconditioning ditches, installing erosion control, installing signs, and applying pavement markings.
     

    NOTICE TO OFFERORS:

    Offerors must submit a price for the first Task Order, Blue Lake Road (Volume II), which is being
    issued simultaneously with this MATOC Request for Proposal. The Government intends to award
    the Blue Lake Road Task Order to the successful MATOC Offeror with the lowest individual Task
    Order price. For the MATOC (Technical Proposal) RFP and Task Order-RFP, whenever possible,
    award will be made without discussions.

    Link to CA MATOC RFP:  https://sam.gov/workspace/contract/opp/630eb2d89217455ab097c221e99a79d0/view

    Key dates

    1. October 22, 2025Posted Date
    2. October 23, 2025Proposals / Responses Due

    AI search tags

    Frequently asked questions

    CA FLAP MOD 258(1) BLUE LAKE ROAD is a federal acquisition solicitation issued by DEPARTMENT OF TRANSPORTATION. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.