Closed Solicitation · DEPT OF DEFENSE

    CANNON AFB - OPERATION AND MAINTENANCE OF WASTEWATER TREATMENT PLANT

    Sol. FA485526R0001Combined Synopsis/SolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)CANNON AFB, NM
    Closed
    STATUS
    Closed
    closed Jan 7, 2026
    POSTED
    Dec 2, 2025
    Publication date
    NAICS CODE
    221320
    Primary industry classification
    PSC CODE
    M1ND
    Product & service classification

    AI Summary

    This opportunity involves the operation and maintenance of the Wastewater Treatment Plant at Cannon AFB, New Mexico. The vendor will provide all necessary management, tools, and certified personnel to ensure compliance with federal, state, and local laws. The contract is a firm-fixed price with a performance period from March 2026 to August 2029.

    Contract details

    Solicitation No.
    FA485526R0001
    Notice Type
    Combined Synopsis/Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    December 2, 2025
    Response Deadline
    January 7, 2026
    NAICS Code
    221320AI guide
    PSC / Class Code
    M1ND
    Issuing Office
    FA4855 27 SOCONS LGC
    Primary Contact
    Karina Bala
    State
    NM
    ZIP Code
    88103-5321
    AI Product/Service
    service

    Description

    *** Amendment 001** This amendment corrects the date for solicitation close out from January 07 2025 to January 7 2026. Additionally updates were made to Attachment 1 WWTP Performance Work Statement dated Nov 26 2025.

    *** Amendment 002** This amendment adds a second date for the site visit from December 4th 2025 to December 4th and December 11th 2025. Individuals that are coming to the Site Visit on December 11th must contact the POCs by December 8th 2025. 

    This acquisition is for non-personal services. The Vendor shall provide all management, tools, supplies, equipment, certified personnel and labor necessary to ensure Wastewater Treatment Plant (WWTP) services are performed at Cannon AFB, New Mexico, in accordance with all federal, state, and local laws. The Cannon AFB WWTP has a total capacity of approximately 1.5 million gallons per day (MGD). Service includes the operation, maintenance, inspection, and repair of all equipment at the WWTP in strict accordance with Performance Work Statement (PWS). Services include, but are not limited to, the following:


    • Establishing a preventative maintenance inspection (PMI) program to include maintenance work, report submittal, and record maintenance.
    • Performing sampling and laboratory analysis.
    • Waste and effluent disposal.
    • Perform sludge and grit disposal to maintain a clean and orderly site.
    • Prepare all related correspondence and operating reports.
    • Operating the WWTP IAW Cannon AFB's New Mexico Environment Department state-issued discharge permit.
    • Visual inspection and calibration of flow meters to the Cannon AFB Golf Course Pond and North Playa Lake.
    • Service is required 24 hours a day, seven (7) days per week.
    • Services will be performed at the WWTP located on Cannon AFB, NM.


    There are no unique requirements related to this service.
    Contract vehicle available for this acquisition is a firm-fixed price contract.


    The period of Performance will be:
    • 01 Mar 2026- 28 Feb 2027 (base year)
    • 01 Mar 2027 - 29 Feb 2028 (OY1)
    • 01 Mar 2028- 28 Feb 2029 (OY2)
    • 1 Mar 2029 - 31 Aug 2029 (6 Month extension of services if needed)

    Key dates

    1. December 2, 2025Posted Date
    2. January 7, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    CANNON AFB - OPERATION AND MAINTENANCE OF WASTEWATER TREATMENT PLANT is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.