Closed Solicitation · DEPT OF DEFENSE

    CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION

    Sol. W51DQV25RA004Award NoticeSAN JUAN, PR
    Closed
    STATUS
    Closed
    POSTED
    Sep 30, 2025
    Publication date
    NAICS CODE
    237990
    Primary industry classification
    PSC CODE
    Z2KB
    Product & service classification

    AI Summary

    The Cano Martin Pena Ecosystem Restoration Project involves extensive site development, including dredging, debris removal, and installation of protective measures for bridges. Key tasks include dredging access channels and stabilizing walls with sheet piles. This project is crucial for enhancing the ecological integrity of the area and protecting infrastructure. Bidders should be prepared for significant excavation and construction activities.

    Contract details

    Solicitation No.
    W51DQV25RA004
    Notice Type
    Award Notice
    Posted Date
    September 30, 2025
    Response Deadline
    NAICS Code
    237990AI guide
    PSC / Class Code
    Z2KB
    Issuing Office
    W2SR TF VIPR
    Primary Contact
    Anika Hillaire
    State
    PR
    ZIP Code
    00918-0000
    AI Product/Service
    both

    Description

    This project includes site development to support construction such as dredging, debris removal, installation of sheet piles, and bridge protection measures. The contract includes the site development of Ciudad Deportiva Roberto Clemente (CDRC) Material Management Area (MMA), dredging of the Aquatic Disposal Pit (ADP) SJ1A with disposal at ADPs SJ2A, SJ3, and SJ4/5, dredging of 3,000 meters-long access channel across San Jos� Lagoon (SJL), bridge fenders to protect the concrete piers of the Moscoso Bridge near the SJL access channel, dredging of 450 meters-long transition channel between main channel and SJL access channel, dredging of 900 meters long main channel from the Barbosa bridge to San Jose Lagoon transition channel as a wall-stabilized channel composed of steel sheet pile walls with concrete cap along main channel with natural bottom, and construction of an approximately 61 meters-long riprap channel at the Barbosa Bridge to protect the foundation from scour associated with reestablishing flow through the CMP.

    Key dates

    1. September 30, 2025Posted Date

    AI search tags

    Frequently asked questions

    CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.