Active Solicitation · DEPT OF DEFENSE
AI Summary
The 183d Wing at the Abraham Lincoln Capital Airport requires a firm-fixed-price construction contract to upgrade the Uninterrupted Power Supply (UPS) system in Building 8. The project includes the removal of an existing UPS system and installation of a new scalable 20 kW UPS system, with a performance period of 120 days post-Notice to Proceed.
The 183d Wing (183WG) at the Abraham Lincoln Capital Airport, Air National Guard Base, Springfield, IL, has a requirement for a firm-fixed-price construction contract to upgrade the Uninterrupted Power Supply (UPS) system in Building 8.
SITE VISIT - 11 AUG 2026 @ 1300.
The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and non-personal services necessary to remove the existing 10 kW UPS system and install a new scalable 20 kW UPS system.
Key scope items include:
Period of Performance: 120 days or less after issuance of Notice to Proceed (NTP).
See Solicitation for additional information.
CES EXPANSION UPS UPGRADE is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.