Active Solicitation · DEPARTMENT OF STATE

    CHANCERY 3003 INTEGRATED WINDOW BLINDS (104)

    DEPARTMENT OF STATE
    Sol. PR16077115Special NoticeWASHINGTON, DC
    Open · 22d remaining
    DAYS TO CLOSE
    22
    closes Aug 5, 2026
    POSTED
    Jul 14, 2026
    Publication date
    NAICS CODE
    238390
    Primary industry classification
    PSC CODE
    N099
    Product & service classification

    AI Summary

    The Department of State is seeking contractors for the refurbishment of 104 integrated venetian blinds in Bern, Switzerland. The project includes inspection, repair, and motor retrofit to restore full functionality. Bidders must provide a comprehensive, all-inclusive offer covering labor, materials, equipment, and logistics, ensuring compliance with Swiss regulations.

    Contract details

    Solicitation No.
    PR16077115
    Notice Type
    Special Notice
    Posted Date
    July 14, 2026
    Response Deadline
    August 5, 2026
    NAICS Code
    238390AI guide
    PSC / Class Code
    N099
    Issuing Office
    U.S. EMBASSY BERN
    Primary Contact
    Paul Aeschlimann
    State
    DC
    ZIP Code
    20520
    AI Product/Service
    service

    Description

    Statement of Work (SOW): Maintenance & Motor Retrofit (Final Version)

    Project: Refurbishment of 104 Integrated Venetian Blinds
    Location: Office Building – Bern, Switzerland
    System Type: Warema Type 1.16/25/35.07 (24v motor) inside WICONA WICLINE Aluminum Composite Windows

    1. Project Objective

    The contractor shall provide a turnkey solution for the inspection, repair, and motor retrofit of 104 integrated venetian blinds. The objective is to restore 100% motorized functionality while maintaining the thermal, acoustic, and aesthetic integrity of the WICONA window units.

    2. Comprehensive Pricing & Scope

    The offer submitted by the contractor must be all-inclusive. No additional costs will be entertained after the contract award. The bid price shall include:

    • Labor: All technician, electrician, and logistical personnel hours.
    • Materials: All motors, cables, lift tapes, ladder cords, and hardware components.
    • Equipment: All tools, specialized window opening devices, safety gear, and cleaning supplies.
    • Transportation: All travel costs, vehicle expenses, and shipping/freight for parts.
    • Fees: Disposal fees, administrative costs, and any required permits or insurance.

    3. Logistics & Site Management

    • Furniture Management: Contractor shall move office furniture and equipment as required to gain unobstructed access to the windows. All items must be protected and returned to their original positions upon completion.
    • Surface Protection: Provide appropriate floor and wall protection during the transit of tools and components.

    4. Health, Safety & Electrical Standards

    • Qualified Personnel: Only certified electricians (per Swiss regulations) may perform electrical work.
    • Lockout/Tagout (LOTO): A strict LOTO procedure must be implemented. Hazardous energy sources must be isolated, locked, and tagged before work commences.
    • Verification: Zero-energy state must be verified via testing before physical contact with wiring.
    • Controls: Each motor control shall be integrated into the Building KNX system.

    5. Technical Execution: WICONA & Warema Systems

    • Sash Access: Open the internal "sandwich" sash of the WICONA windows using the integrated latches.
    • Hardware Maintenance: Inspect and lubricate all WICONA latching mechanisms and concealed hardware.
    • Gasket Inspection: Verify the condition of internal gaskets. Damaged seals must be reported or replaced to ensure the cavity remains dust and moisture-free.
    • Blind Retrofit:
      • Identify and replace failed motors with compatible high-quality alternatives (e.g., Somfy, Elero) that fit the existing Warema headrails.
      • Replace worn lift tapes and ladder cords as necessary to ensure smooth mechanical operation.

    6. Commissioning & Integration

    • Calibration: Set electronic end-limits (upper/lower) for every unit.
    • Testing: Perform three full cycles (Up/Down/Tilt) per window to ensure defect-free operation.
    • System Integration: Ensure new motors are integrated into the existing building control or radio systems.

    7. Waste Disposal (Swiss Compliance)

    • Swiss Codes: Disposal must comply with vREG/ORDEA (Electrical Waste) and VeVA/OMW (Waste Movements).
    • Recycling: Deliver old motors and aluminum scrap to authorized SENS eRecycling or Swico collection points.
    • Evidence: Contractor shall provide official disposal certificates (Entsorgungsnachweis).

    8. Cleaning & Handover

    • Internal Cleaning: Clean internal glass surfaces and aluminum slats before closing the sash.
    • Final Report: Provide a list of all units serviced, including specific motor model numbers used.

    Key dates

    1. July 14, 2026Posted Date
    2. August 5, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    CHANCERY 3003 INTEGRATED WINDOW BLINDS (104) is a federal acquisition solicitation issued by DEPARTMENT OF STATE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.