Closed Solicitation · DEPT OF DEFENSE
AI Summary
The project involves upgrading and modifying the low voltage electrical and lighting systems at Eielson AFB's Central Heat Power Plant. This includes the removal and replacement of outdated electrical panels, transformers, and lighting fixtures. The estimated cost is between $1,000,000 and $5,000,000, and only electronic submissions will be accepted.
The purpose of this project is to upgrade and modify the low voltage electrical and lighting systems at Eielsons Central Heat Power Plant (CHPP) to include removal, and replacement of the existing electrical panels, associated transformers, and the remainder of existing outdated lighting fixtures within CHPP facility at Eielson AFB.
A. The NAICS code is 238210 with a Small Business Size Standard of $39.5M.
B. The magnitude for this requirement IAW FAR 36.204(f) is between $1,000,000.00 and $5,000,000.
C. Payment and Performance bonds shall be obtained IAW FAR 28.102.
D. IAW with FAR 14.202-8 Electronic bids, ONLY ELECTRONIC submissions will be accepted.
CHPP PHASE C is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.