Closed Solicitation · DEPT OF DEFENSE

    CLIMBING TOWER MAINTENANCE AND RESTORATION

    Sol. W911RZClimbingTowermaintenanceandRestorationSources SoughtSet-aside: Total Small Business Set-Aside (FAR 19.5)FORT CARSON, CO
    Closed
    STATUS
    Closed
    closed Sep 9, 2025
    POSTED
    Sep 5, 2025
    Publication date
    NAICS CODE
    236220
    Primary industry classification
    PSC CODE
    Z2JZ
    Product & service classification

    AI Summary

    The Department of Defense is seeking information from contractors capable of providing climbing wall maintenance and restoration services at Fort Carson. The project includes various structural repairs, waste management, and ensuring safety compliance. Responses are due by 0900 AM MST on September 09, 2025. This is a sources sought notice and not a request for proposals.

    Contract details

    Solicitation No.
    W911RZClimbingTowermaintenanceandRestoration
    Notice Type
    Sources Sought
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    September 5, 2025
    Response Deadline
    September 9, 2025
    NAICS Code
    236220AI guide
    PSC / Class Code
    Z2JZ
    Issuing Office
    W6QM MICC-FT CARSON
    Primary Contact
    Julia Gomez
    State
    CO
    ZIP Code
    80913-5198
    AI Product/Service
    service

    Description

    THIS IS A SOURCES SOUGHT NOTICE REQUESTING INFORMATION IN SUPPORT OF THE FOLLOWING REQUIREMENT. This is NOT a Request for Proposal (RFP) or an announcement of a forthcoming solicitation. The Government is seeking information concerning the availability of capable contractors to provide:  

    All resources and materials needed to execute climbing renovations and modifications. The contractor will warranty all work one year from date of completion and closeout. It will be the responsibility of the contractor to procure all materials, coordinate manpower, and conduct scheduling to ensure a timely completion per the agreed upon call order period of performance.  Period of Performance: 30 September 2025- 31 March 2026

    5.1 Basic Services.  The Contractor shall provide services for all waste management ensuring it is properly disposed of off-site. The Contractor will always maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.  The contractor will regrout and repaint structural steel base plates.  The contractor will clean and repaint all panel rebar hooks.  The contractor will  replace all missing, worn, or unserviceable t-nuts and corresponding anchor points.  The contractor will remove and repair all loose and delaminated concrete.  The contractor will patch all cracks properly routing out to ensure a clean and durable bond.  The contractor will paint and seal all repair areas identified (any abnormality in the climbing wall and/or structure as compared to original or intended state).  The contractor will patch and seal the top of the structure to cover exposed substructure and reduce water intrusion.  The contractor will repaint and seal the entire climbing wall.  The contractor will repaint and seal all portions of the primary steel structure with signs of flaking, corrosion, or damage.  Corrosion, cracks, and/or other abnormalities will be identified, removed, and structurally reinforced with appropriate welding and or fastening.  The contractor will scour and seal the existing concrete with textured sealant.   The contractor will adjust and orient all top rope and lead bolt hangars.  A load test will be performed to support intensive training loads and a safe and maximum load capacity reports will be generated for all existing anchor points.  The contractor will have the appropriate experience and credentialling to conduct climbing wall repairs of this scale. Lack of appropriate experience and/or credentialing will result in immediate termination.  It will be the responsibility of the contractor to procure all materials, coordinate manpower, and conduct scheduling to ensure a timely completion per the agreed upon period of performance.  The contractor, subcontractors, and all personnel associated with the project must have the appropriate access to Fort Carson and appropriate climbing wall restoration experience and/or credentialing.

     No contract will be awarded from this announcement. This source sought notice should not be construed as a commitment or authorization to incur costs in anticipation of such a procurement.  MICC Fort Carson is interested in obtaining responses from prospective contractors, but no contractor will be reimbursed for providing this information, therefore MICC-Ft. Carson will accept the requested information in whatever format it is provided. All information provided shall become property of the U.S. Army and will not be returned. Responses are requested by 0900 AM Mountain Standard Time on September 09, 2025.

    Key dates

    1. September 5, 2025Posted Date
    2. September 9, 2025Proposals / Responses Due

    AI search tags

    Frequently asked questions

    CLIMBING TOWER MAINTENANCE AND RESTORATION is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.