Closed Solicitation · DEPARTMENT OF TRANSPORTATION

    CO NP MEVE 201(1) , CEDAR TREE TOWER ROAD AND PARKING

    Sol. 6982AF25B000024PresolicitationLAKEWOOD, CO
    Closed
    STATUS
    Closed
    closed Sep 24, 2025
    POSTED
    Oct 3, 2025
    Publication date
    NAICS CODE
    237310
    Primary industry classification
    PSC CODE
    Y1LB
    Product & service classification

    AI Summary

    The project involves roadway, parking lot, and retaining wall improvements at Mesa Verde National Park, Colorado. It includes resurfacing, restoration, and rehabilitation across 11 locations, with a total of 4.7 miles of improvements. A pre-bid site visit is scheduled for October 9, 2025, and the anticipated construction start date is April 1, 2026.

    Contract details

    Solicitation No.
    6982AF25B000024
    Notice Type
    Presolicitation
    Posted Date
    October 3, 2025
    Response Deadline
    September 24, 2025
    NAICS Code
    237310AI guide
    PSC / Class Code
    Y1LB
    Primary Contact
    Denise Martinez
    State
    CO
    ZIP Code
    80228
    AI Product/Service
    both

    Description

    CO NP MEVE 201(1) CEDAT TREE TOWER ROAD AND PARKING

    PROJECT DESCRIPTION:  Project improvements are within Mesa Verde National Park in Cortez, Colorado.  This resurfacing, restoration, and rehabilitation (3R) roadway, parking lot, and lagging wall improvement project spans spanning across 11 locations in Mesa Verde.  The elevations range from 6954 to 8062-feet.  The project has one Schedule A (4.7 miles total) and Option X (0.2 miles).

    PRE-BID SITE VISIT:  OCTOBER 9, 2025 - See link below for details

    SCOPE OF THE WORK: The 11 identified project locations and proposed improvements are as follows:

    Schedule A Improvements:

    1. Route 0010 (Main) Entrance Road:
      1. Road Improvements: Begins at the roundabout and ends at Morefield Ranger Station. Pavement preservation includes crack seal, chip seal, fog seal existing paved shoulders, and striping, including a passing lane where it was left out previously. 
      2. Retaining Wall Improvements: Remove and replace damaged timber lagging and existing steel soldier pile retaining wall, at 8 identified locations as shown in the contract drawings, and as directed by the Contracting Officer.  Cut and remove damaged portions of existing steel soldier piles.  Install splice plates and new steel members to restore structural integrity.  Replace timber lagging in affected areas to match existing dimensions.
    2. Route 0205 Cedar Tree Tower Road: FDR and widening the roadway to include two 9-foot lanes with 1-foot shoulders and adding 5 parallel parking spaces along the teardrop and edge of the roadway. Adjacent to the parking spaces will be curb and sidewalk as well as an ABA curb ramp. Provide culvert lining to preserve the existing 18-inch culverts, with no impacts to the historic headwalls.  All work will remain on the existing bench due to environmental constraints.
    3. Route 0210 Far View Ruins (Site) Road: FDR and widening the roadway slightly to include two 9-foot lanes with 1-foot shoulders and adding 12 parallel parking spaces on the north side of the roadway into the teardrop. Adjacent to the parking spaces will be curb and sidewalk as well as an ABA curb ramp. Construct a concrete pad adjacent to the parking spaces to house the existing portable toilets. Provide culvert lining to preserve the existing 24-inch culverts, with no impacts to the historic headwalls.  All work will remain on the existing bench due to environmental constraints.
    4. Route 0200 Wetherill Mesa Road: Begins at Mesa Top Ruins Road extending north to the far edge of 0912BZ Far View Terrace Parking B (Loading Dock).  Full depth reclamation (FDR), adding 4-inch asphalt pavement and removing and replacing an existing 24-inch culvert.  All work will remain in the existing footprint and no alterations will be made to the horizontal or vertical alignment.
    5. Route 0404 Far View Residence Road: FDR the roadway from the intersection with Mesa Top Ruins Road to 0912AZ Far View Terrace Parking A. All work will remain in the existing footprint and no alterations will be made to the horizontal or vertical alignment.
    6. Route 0912AZ Far View Terrace Parking A: Pulverize the existing parking area and add 4-inch asphalt pavement. Restripe existing parking stalls, all diagonals. Protect east islands in place, remove and pave area of west islands. Install ABA stalls on the NNW corner of the lot and redo existing sidewalk to match ABA requirements. Install a 10-foot wide concrete bus pad along the sidewalk in front of the Far View Terrace Café. Remove all concrete curb and gutter throughout the parking area and replace with 6-inch concrete curb. All work will remain in the existing footprint and no alterations will be made to the horizontal or vertical alignment.
    7. Route 0912BZ Far View Terrace Parking B (Loading Dock): FDR, remove and replace existing 24” culverts and adding a concrete pad for the dumpster. Add a valley pan from the dumpster pad to the culvert to help drainage reach the existing culvert. All work will remain in the existing footprint and no alterations will be made to the horizontal or vertical alignment.
    8. Route 0925 Side Headquarters and Post Office Parking: Pulverize existing roadway, add geogrid, add Asphalt Pavement Patching, Type 2 to the first half of the alignment and install a 4-inch asphalt pavement overlay to the other half. All work will remain in the existing footprint and no alterations will be made to the horizontal or vertical alignment.
    9. Route 0918 Visitor Center Parking (Far View Center Parking Lot): Pulverize the existing parking area and add 4-inch asphalt pavement on top of the existing concrete. Construct new road connection between the north side of this parking area and RTE 0200 Wetherill Mesa Road. This connection will replace the existing picnic area that is no longer in use. This will have a pavement section of 4-inches of asphalt concrete pavement over 6-inches of roadway aggregate, method 2 and will match the existing slopes as close as possible.

    Option X Improvements:

    1. Route 0409A Stone House Roads A: Rehabilitate the existing asphalt up to the garage, clearing any vegetation in the asphalt up to the existing stone curbs. All work will remain in the existing footprint and no alterations will be made to the horizontal or vertical alignment. 
    2. Route 0409B Stone House Roads B: Rehabilitate the existing asphalt up to the garage, clearing any vegetation in the asphalt up to the existing stone curbs. All work will remain in the existing footprint and no alterations will be made to the horizontal or vertical alignment. 

    PRINCIPAL WORK ITEMS:

    Schedule A

    Pay Item   /   Description   /   Quantity

    30402-5200   Full Depth Reclamation, Method 2, 4-inch depth   10,000 square yards

    30402-5200   Full Depth Reclamation, Method 2, 6-inch depth   14,000 square yards

    40301-0100   Asphalt Concrete Pavement, Type 1   4,700 tons

    40702-0200   Chip Seal, Type 1B   58,500 square yards

    40711-0000   Emulsified Asphalt   58,500 square yards

    41801-1000   Asphalt Concrete Pavement Patch, Type 1   750 square yards

    55502-0000   Structural Steel, Furnished, Fabricated, and Erected   12,219 pounds

    60901-0000   Curb, Concrete   3,000 linear feet

    Option X:

    Pay Item   /   Description   /   Quantity

    30202-2000   Roadway Aggregate, Method 2   70 tons

    30402-5200   Full Depth Reclamation, Method 2, 4-inch depth   2,200 square yards

    40301-0100   Asphalt Concrete Pavement, Type 1   500 tons

    60707-0300   Lining 18-inch Pipe Culvert   2 each

    60901-2900   Curb, Stone, Type 1, 6-inch   40 linear feet

    63501-0000   Temporary Traffic Control   Lump Sum

    ANTICIPATED SCHEDULE: 

    • Advertisement: 10.15.2025.
    • Award: 12.09.2025.
    • Notice to Proceed: 01.12.2026.
    • Construction: 04.01.2026 through 08.28.2026.

    ESTIMATED COST RANGE: Schedule and all Options are between $5,000,000 and $10,000,000.

    Key dates

    1. October 3, 2025Posted Date
    2. September 24, 2025Proposals / Responses Due

    AI search tags

    Frequently asked questions

    CO NP MEVE 201(1) , CEDAR TREE TOWER ROAD AND PARKING is a federal acquisition solicitation issued by DEPARTMENT OF TRANSPORTATION. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.