Closed Solicitation · DEPT OF DEFENSE

    CONCRETE BPA ORDER - RIPRAP IN POOL 11 - HURRICANE ISLAND, WI

    Sol. W912EK24QCA07POOL11Special NoticeSet-aside: Total Small Business Set-Aside (FAR 19.5)ROCK ISLAND, IL
    Closed
    STATUS
    Closed
    closed Jul 25, 2025
    POSTED
    Jul 17, 2025
    Publication date
    NAICS CODE
    327320
    Primary industry classification
    PSC CODE
    5610
    Product & service classification

    AI Summary

    The U.S. Army Corps of Engineers seeks quotes for the supply of 20,000 tons of RR-5 Riprap for the Mississippi River Project Office, with options for an additional 40,000 tons. Interested vendors must submit quotes by July 16, 2025, at 2:00 PM CST. Deliveries will occur between River Miles 606-609 near Cassville, Wisconsin, starting no later than two weeks post-award. Quotes must adhere to the specified guidelines to be considered for the contract.

    Contract details

    Solicitation No.
    W912EK24QCA07POOL11
    Notice Type
    Special Notice
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    July 17, 2025
    Response Deadline
    July 25, 2025
    NAICS Code
    327320AI guide
    PSC / Class Code
    5610
    Primary Contact
    Bobbi Boeh
    State
    IL
    ZIP Code
    61299-5001

    Description

    The U.S Army Corps of Engineers (USACE) require the supply of RR-5 Riprap to the Mississippi River Project Office (MRPO)- Project Maintenance Unit to be placed by USACE personnel and floating plant assets.  A call order was issued via email to all current blanket purchase agreement (BPA) holders to submit quotes on 16 July 2025 at 2:00 PM CST. In accordance with FAR 5.101(a)(1) proposed contract actions expected to exceed $25,000 must be disseminated by synopsizing in the Governmentwide point of entry, which is https://www.sam.gov.

    Pool 11 - Riprap Suppy Purchase Description:

    Supply and load 20,000 tons of general-purpose riprap, in accordance with paragraph k, with options for an additional 40,000 tons. Riprap will be placed by USACE personnel and floating plant assets. The contractor will be responsible for delivering and loading riprap onto the deck of USACE barges. The loading of riprap must take place between River Miles 606 - 609 of the Upper Mississippi River, near Cassville Wisconsin.

    Base: Up to and including 20,000 tons general purpose riprap. The contractor will be paid based on actual quantities delivered. The contractor should be ready to start delivery within two weeks of contract award, however, project start date may vary due to current workload of the Project Maintenance Fleet or unforeseen delays mentioned above. It is anticipated for loading to begin between the dates of August 01, 2025 and September 01, 2025. The exact start date will be identified to the contractor upon contract award.

    Option 1: Up to and including 15,000 tons general purpose riprap. The contractor will be paid based on actual quantities delivered. The Government reserves the right to exercise Option 1 no later than 15 September 2025.  The delivery start date is to be NLT two (2) weeks after exercising Option 1.

    Option 2: Up to and including 10,000 tons general purpose riprap. The contractor will be paid based on actual quantities delivered.  The Government reserves the right to exercise Option 2 no later than 15 September 2025.  The delivery start date is to be NLT two (2) weeks after exercising Option 2.

    Option 3: Up to and including 5,000 tons general purpose riprap. The contractor will be paid based on actual quantities delivered.  The Government reserves the right to exercise Option-  no later than 15 September 2025.  The delivery start date is to be NLT two (2) weeks after exercising Option 3.

    Option 4: Up to and including 5,000 tons general purpose riprap. The contractor will be paid based on actual quantities delivered. The Government reserves the right to exercise Option 4 no later than 15 September 2025.  The delivery start date is to be NLT two (2) weeks after exercising Option 4.

    Option 5: Up to and including 5,000 tons general purpose riprap. The contractor will be paid based on actual quantities delivered. The Government reserves the right to exercise Option 5 no later than 15 September 2025.  The delivery start date is to be NLT two (2) weeks after exercising Option 5.

    Interested vendors may submit a quote by completing the bid schedule in the attached statement of work and sending it to the email contacts listed below before the deadline posted on this notice.

    Unless a quote received via this notice is less than the lowest priced offer received from the BPA holders, quotes submitted in response to this notice will not be considered for award.

    In the unlikely event that an award is made from response to this notice the terms and conditions would be similar to the Pool 11 - Riprap Supply Purchase Description Terms found in the Attachments/Links section below.

    Attachments/Links

    1. Pool 11 - Riprap Supply Purchase Description
    2. Attachment A  - LDOT RR-5 Coarse Alternative Riprap Gradation Curve & Tally Chart

    Updates:

    Posted 17 July 2025 - Extend due date to 25 July 2025 at 2:00 PM CST. 

    Key dates

    1. July 17, 2025Posted Date
    2. July 25, 2025Proposals / Responses Due

    Frequently asked questions

    CONCRETE BPA ORDER - RIPRAP IN POOL 11 - HURRICANE ISLAND, WI is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.