Active Solicitation · DEPT OF DEFENSE
AI Summary
The U.S. Army Corps of Engineers intends to award a firm-fixed-price contract for the construction of a Radio Frequency Hangar Facility at Whiteman Air Force Base, MO. The project includes a reinforced concrete foundation, metal roofing, and supporting infrastructure. Interested bidders should note the site visit request deadline of April 16, 2026.
CONTRACT INFORMATION: The U.S. Army Corps of Engineers (USACE) Kansas City District (NWK) intends solicit, negotiate, and award a one-time Unrestricted, Firm-Fixed-Price, Design-Bid-Build, construction contract to construct a Radio Frequency/Measurements Hangar Facility with one aircraft position and all associated back shops, material storage, and administrative and facility support spaces. at Whiteman Air Force Base (WAFB), MO. Scope of Work: The scope of this contract is to construct a Radio Frequency/Measurements Hangar Facility with one aircraft position and all associated back shops, material storage, and administrative and facility support spaces. The facility will consist of both unclassified and classified spaces for a total square footage of 5,345 square meter (57,532 square feet). Structure will feature a new reinforced concrete foundation by replacing the paved area east of the existing Phase Hangar (Building 9), a metal roof, metal siding panels on steel framing and girts above a masonry cavity wall and Concrete Masonry Unit wall assembly around the base of the facility, and powered steel sliding hangar doors. The project will also include supporting facilities such as utilities, pavements, site improvements, and other necessary infrastructure to have a complete and usable facility. Amendment 0003: Includes changes highlighted red in document titled, (Solicitation W912DQ26RA019_WAFB_RF HANGAR_RTA revised 08Apr2026), and inclusion of Attachment A, Attachment A_B-21 RF_ Site Visit_EAL all secure entry 26_Name. Primary changes are to Site Visit Information to provide additional instructions on submitting entry authorization letter (EAL) form for Whiteman Air Force Base. Site visit request are now due on 16 April 2026.
Construction of B-21 Radio Frequency (RF) Hangar is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.