Closed Solicitation · DEPT OF DEFENSE

    CONTROL SYSTEM UPGRADES AND REPLACEMENT WORK ON TADANO INFRASTRUCTURE SOLUTIONS CO., LTD. LAND PORTAL CRANES, LC47 AND LC48 AT BERTH 12 IN THE COMMANDER FLEET ACTIVITIES YOKOSUKA (CFAY), JAPAN

    Sol. N40084-26-R-0405Sources SoughtFPO, AP
    Closed
    STATUS
    Closed
    closed Apr 6, 2025
    POSTED
    Mar 5, 2026
    Publication date
    NAICS CODE
    33324
    Primary industry classification
    PSC CODE
    Z1PZ
    Product & service classification

    AI Summary

    This opportunity involves control system upgrades and replacement work on land portal cranes LC47 and LC48 at Berth 12, Commander Fleet Activities Yokosuka, Japan. The contractor will be responsible for procuring and installing electrical equipment, conducting inspections, and ensuring proper operation of the cranes. All work must comply with the latest manufacturer standards and safety protocols.

    Contract details

    Solicitation No.
    N40084-26-R-0405
    Notice Type
    Sources Sought
    Posted Date
    March 5, 2026
    Response Deadline
    April 6, 2025
    NAICS Code
    33324AI guide
    PSC / Class Code
    Z1PZ
    Contract Code
    1700
    Issuing Office
    NAVFACSYSCOM FAR EAST
    Primary Contact
    Toshiki Hisasue
    City
    FPO
    ZIP Code
    96349-0013
    AI Product/Service
    service

    Description

    The purpose of this procurement is to acquire control system upgrades and replacement work on land portal cranes, LC47 and LC48 at Berth 12. The upgrades and replacement work includes but is not limited to upgrading the cranes control systems. Upgrades and replacements include: • Procure and install replacement items and materials for various electrical equipment, inverters, programmable logic controllers (PLC) to include wiring connections to the replaced items, and computer software. Contractor shall be responsible for all applicable components and sub-components to maintain accordance with the late manufacturer’s standard • Inspection for all applicable components and sub-components for conditions, cleanliness, damage, defects, deterioration, corrosion, proper operating record to load/unload for applicable capacities, electrical connections, and the locations/positions correction as required, and verify the equipment location is free of debris and/or flammable material, during and/or end of the work scheduled daily and the completion of the work. Validation is required for the designated crane conditions and applicable capacities upon the receipt of task orders. Note: The Contractor shall record all operated works specifications and results, and submit it per SOW. Upon completion of above on-site works, put systems back to normal operation and check to ensure that equipment and systems are operating properly. Validate the operation/work entire area for the task order, and ensure all applicable power on/off device, on/off method, and positioned correctly before and after performing the work is the high priority for the Contractor protection in performance safety, and the site personnel/property safety.

    Key dates

    1. March 5, 2026Posted Date
    2. April 6, 2025Proposals / Responses Due

    AI search tags

    Frequently asked questions

    CONTROL SYSTEM UPGRADES AND REPLACEMENT WORK ON TADANO INFRASTRUCTURE SOLUTIONS CO., LTD. LAND PORTAL CRANES, LC47 AND LC48 AT BERTH 12 IN THE COMMANDER FLEET ACTIVITIES YOKOSUKA (CFAY), JAPAN is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.