Active Solicitation · DEPT OF DEFENSE

    DEDICATED COMMERCIAL ISP CIRCUIT INSTALLATION AND SERVICE - HILL AFB

    Sol. FA820426_SSS_ISP_ServiceSources SoughtHILL AFB, UT
    Open · 15d remaining
    DAYS TO CLOSE
    15
    closes Jul 29, 2026
    POSTED
    Jul 14, 2026
    Publication date
    NAICS CODE
    517111
    Primary industry classification
    PSC CODE
    DG11
    Product & service classification

    AI Summary

    The Department of the Air Force is seeking sources for a dedicated commercial ISP circuit installation and service at Hill AFB. This opportunity involves providing a 10 Gbps fiber optic connection, ensuring network isolation, and maintaining service. Interested vendors must submit a Capability Statement by July 29, 2026, detailing their qualifications and small business status under NAICS 517111.

    Contract details

    Solicitation No.
    FA820426_SSS_ISP_Service
    Notice Type
    Sources Sought
    Posted Date
    July 14, 2026
    Response Deadline
    July 29, 2026
    NAICS Code
    517111AI guide
    PSC / Class Code
    DG11
    Issuing Office
    FA8204 AFNWC PZBA
    Primary Contact
    Angel McKenzie
    State
    UT
    ZIP Code
    84056-5837
    AI Product/Service
    service

    Description

    SOURCES SOUGHT SYNOPSIS

    Title: Dedicated Commercial ISP Circuit Installation and Service – Hill AFB
    Program Name: AFNWC Commercial ISP
    Notice Type: Sources Sought
    NAICS Code: 517111 (Wired Telecommunications Carriers)
    Product Service Code (PSC): DG11 (IT and Telecom - Network: Telecom Access Services)

    1.0 INTRODUCTION AND DISCLAIMER

    1.1 NOTICE: This is not a solicitation but rather a Sources Sought Synopsis to determine potential sources for information and planning purposes only.

    1.2 The purpose of this Sources Sought is to conduct market research to determine if responsible sources exist, to assist in determining if this effort can be competitive and/or a total Small Business Set-Aside. The proposed North American Industry Classification Systems (NAICS) Code is 517111, which has a corresponding Size standard of 1,500 employees.

    1.3 The Government will use this information to determine the best acquisition strategy for this procurement. The Government is interested in all small businesses to include 8(a), Service-Disabled Veteran-Owned, HUBZone, and Women-Owned small business concerns. The government requests that interested parties respond to this notice if applicable and identify your small business status to the identified NAICS code.

    1.4 This notice is issued solely for information and planning purposes and does not constitute a solicitation or a promise to issue a solicitation in the future. The Government will not pay for any information or administrative costs incurred in response to this notice. All costs associated with responding to this notice will be solely at the interested party’s expense.

    2.0 BACKGROUND

    The Department of the Air Force at Hill Air Force Base (AFB), Utah, has a requirement for a dedicated, high-speed commercial Internet Service Provider (ISP) connection. This circuit is required to support isolated government communications and must be entirely independent of the existing base network (AFNet).

    3.0 REQUIREMENT DESCRIPTION

    The Government requires a turnkey commercial ISP solution. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform the installation and ongoing service.

    Core Technical Requirements:

    • Bandwidth & Throughput: Provide a dedicated, low-latency fiber optic 10 Gbps internet connection. The service must be uninterrupted for the duration of the contract.
    • IP Addressing: Provide at least three (3) publicly routable static IP addresses.
    • Network Isolation: The commercial circuit must be completely physically and logically separated from the AFNet.
    • Installation Standards: All work must comply with recognized industry practices, equipment manufacturer instructions, and standard military facility telecommunications criteria (including applicable UFC and ETL standards for interior cabling and electrical systems).
    • Personnel & Security: All contractor personnel performing on-site work must be U.S. citizens. Personnel will be escorted by government staff at all times while in the secure facility. Normal working hours are 0700 to 1600 Monday through Friday.
    • Implementation Timeline: The circuit must be fully installed, tested, and operational no later than fifteen (15) days after contract award.
    • Period of Performance (PoP): One (1) Base Year plus four (4) Option Years.
    • Maintenance: The Contractor shall be responsible for all maintenance and outage management for the commercial ISP circuit.

    4.0 CONTROLLED DISTRIBUTION OF THE STATEMENT OF WORK (SOW)

    The full Statement of Work (SOW) for this requirement contains Controlled Unclassified Information (CUI) regarding specific facility locations and mission support details. It is not available for public download.

    Interested vendors must request the SOW directly from the Contracting Officer via email. To receive the SOW, vendors must provide their CAGE code and Company Name. Once verified, the Government will provide the full SOW via secure transmission (e.g., DoD SAFE).

    5.0 REQUESTED CAPABILITY INFORMATION

    Interested parties are requested to submit a Capability Statement demonstrating their ability to meet the technical requirements outlined in Section 3.0. Responses should be concise and include:

    A. Company Information:

    • Company Name, Address, and Point of Contact (Name, Title, Phone, Email).
    • CAGE Code and Unique Entity Identifier (UEI).
    • Identified Small Business Status under NAICS 517111 (e.g., Small Business, 8(a), HUBZone, SDVOSB, WOSB).

    B. Past Performance & Experience:

    • Provide a description of similar services offered to the Government and to commercial customers for the past three (3) years.

    C. Teaming Arrangements (If Applicable):

    • Provide details of any anticipated teaming arrangements.
    • Delineation of Work: Any responses involving teaming agreements should clearly delineate between the work that will be accomplished by the prime contractor and the work accomplished by the teaming partners.

    D. Technical Capability:

    • A brief description of your company’s capability to provide a dedicated 10 Gbps fiber optic circuit to Hill AFB, UT.
    • Confirmation of the ability to provide the required three (3) static IP addresses.
    • Confirmation of your ability to meet the 15-day operational installation timeline.
    • Indicate whether your services are available on existing Government Wide Acquisition Contracts (GWACs), GSA Schedules, or other enterprise contract vehicles. If so, please provide the contract number(s).

    6.0 SUBMISSION INSTRUCTIONS

    Responses to this Sources Sought must be submitted electronically via email.

    • Submission Deadline: 29 JUL 2026
    • Submit To:
      • Contract Specialist: Angel McKenzie at angel.mckenzie.2@us.af.mil
      • Contracting Officer: Melissa Kennedy at melissa.kennedy.7@us.af.mil

    Please format the subject line of your response email as follows: "Sources Sought Response: Dedicated ISP Hill AFB - [Your Company Name]".

    Key dates

    1. July 14, 2026Posted Date
    2. July 29, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    DEDICATED COMMERCIAL ISP CIRCUIT INSTALLATION AND SERVICE - HILL AFB is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.