Closed Solicitation · DEPT OF DEFENSE
AI Summary
The Deer Island Ecosystem Restoration project involves the construction of a rock breakwater structure to mitigate wave erosion. This initial phase aims to restore Katrina Key to its historical dimensions using armor layer stone and bioengineered reef. Contractors must comply with the updated FAR and DFARS regulations. Proposals are due by July 9, 2026.
Phase 1 Breakwater. This contract involves constructing the initial phase for the restoration of Deer Island, specifically restoring the extension of the rock breakwater structure known as Katrina Key, approximately 12,000 feet, to soften the effects of normal wave erosion. This restoration includes placement of armor layer stone or bioengineered reef as the breakwater and associated geocomposite placement to return Katrina Key to near historical 1850s dimensions. Offerors are hereby advised that all references to the FAR and DFARS within this solicitation pertain to the new Revolutionary FAR Overhaul (https://www.acquisition.gov/far-overhaul/far-part-deviation-guide). While much of the verbiage has remained consistent with the previous version of the FAR and DFARS, there are notable differences. It is incumbent upon the contractor to be fully aware of these changes and ensure their proposal complies accordingly. 5/28/2026: AM0001 posted to PIEE 6/26/2026: AM0002 posted to PIEE 6/30/2026: AM0003 posted to PIEE
Deer Island Ecosystem Restoration, Phase 1 Deer Island, MS (Harrison County) is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.