Closed Solicitation · DEPARTMENT OF TRANSPORTATION

    DEMOLITION, REMOVAL, AND REMEDIATION

    Sol. 6913G626Q300044Combined Synopsis/SolicitationCAMBRIDGE, MA
    Closed
    STATUS
    Closed
    closed Aug 5, 2026
    POSTED
    Aug 4, 2026
    Publication date
    NAICS CODE
    238910
    Primary industry classification
    PSC CODE
    F999
    Product & service classification

    AI Summary

    The Department of Transportation is seeking a contractor for demolition, removal, and remediation services. The contractor must prepare a detailed Work Plan addressing demolition, debris removal, and site restoration, including safety and risk management plans. The project requires a draft submission within 10 business days post-kickoff meeting, followed by a final plan after review. Permits and waste disposal methods must also be included.

    Contract details

    Solicitation No.
    6913G626Q300044
    Notice Type
    Combined Synopsis/Solicitation
    Posted Date
    August 4, 2026
    Response Deadline
    August 5, 2026
    NAICS Code
    238910AI guide
    PSC / Class Code
    F999
    Primary Contact
    Regan, Roland
    State
    MA
    ZIP Code
    02142
    AI Product/Service
    service

    Description

    The Contractor shall submit a draft Demolition, Removal, and Restoration work plan (Work Plan) within 10 business days after attending a kickoff meeting with the Volpe Center representatives that addresses the project requirements below. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all demolition, debris removal, disposal, and site restoration activities as required and described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished site survey report for the facility scheduled for demolition.

    The Work Plan shall describe methods and procedures for dismantling, demolishing, and/or removing structures and equipment designated for disposal, and restoration of the site listed in Section 1.1. Site-specific information is detailed in Section 5.0 Proposed Scope of Work subsections B, C and D in the individual site survey report. The Work Plan shall also identify additional material sampling including sampling methods, analysis and quality control as may be required for waste characterization for all sites, if necessary. Disposal methods must be detailed for including the identification of all disposal facilities where waste and/or debris is to be shipped. In addition the work plan shall also identify any required permits needed to perform the work and the contractor shall be responsible for obtaining those permits as required. Copies of the permits shall be attached to the work plan as an appendix.

    Additional components of the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed. The work plan shall also include a Risk Management Plan that identifies major risks and hazards on the site and discusses ways to minimize these risks. The contractor should expect a 5 business day Volpe Center review period between submission of the Draft Work Plan and receipt of Volpe Center comments. The Volpe Center and the Contractor shall meet to discuss any comments and changes, if necessary. The contractor shall make the changes and submit a Final Work Plan within 5 business days of the receipt of comments.

    See SOW for details.

    Key dates

    1. August 4, 2026Posted Date
    2. August 5, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    DEMOLITION, REMOVAL, AND REMEDIATION is a federal acquisition solicitation issued by DEPARTMENT OF TRANSPORTATION. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.