Active Solicitation · DEPT OF DEFENSE

    DESIGN-BUILD AND CONSTRUCTION SERVICES MATOC TO SUPPORT INDUSTRIAL BASE MODERNIZATION AT GOVERNMENT OWNED - CONTRACTOR OPERATED (GOCO) FACILITIES

    Sol. W519TC_25_R0026PresolicitationROCK ISLAND, IL
    Open · 14d remaining
    DAYS TO CLOSE
    14
    closes May 7, 2026
    POSTED
    Mar 24, 2026
    Publication date
    NAICS CODE
    236210
    Primary industry classification
    PSC CODE
    Y1EA
    Product & service classification

    AI Summary

    The Army Contracting Command intends to issue an RFP for a Multiple Award Task Order Contract (MATOC) to support modernization at Government-Owned, Contractor-Operated facilities. The MATOC will cover various substantial projects, including design, construction, and commissioning of manufacturing lines and facility upgrades. The anticipated RFP release is in April 2026.

    Contract details

    Solicitation No.
    W519TC_25_R0026
    Notice Type
    Presolicitation
    Posted Date
    March 24, 2026
    Response Deadline
    May 7, 2026
    NAICS Code
    236210AI guide
    PSC / Class Code
    Y1EA
    Issuing Office
    W6QK ACC-RI
    Primary Contact
    SFC Pramod Khanal
    State
    IL
    ZIP Code
    61299-0000
    AI Product/Service
    both

    Description

    The Army Contracting Command – Rock Island (ACC-RI) on behalf of Project Lead Joint Services (PL JS) intends to issue a Request for Proposal (RFP) to establish a Multiple Award Task Order Contract (MATOC) to provide comprehensive Design, Build, and Commissioning support for modernization efforts at the Department of War (DOW) Government-Owned, Contractor-Operated (GOCO) Army Ammunition Plants (AAPs) identified hereafter

    The scope of this MATOC is broad and covers a wide range of substantial projects utilizing various methods, including design-build, design-bid-build, and progressive design-build. Projects will support the modernization of the Army’s industrial base and may include, but are not limited to:

    • Design, construction and commissioning of energetic material manufacturing lines (e.g., explosives, propellants).
    • Load, assembly, and pack lines.
    • Shell casing and metal parts production lines.
    • Building upgrades, energy projects, and environmental projects.
    • Full commissioning of new or upgraded facilities to prove production capability and readiness.

    Successful offerors will be responsible for providing all personnel, equipment, supplies, supervision, architectural, engineering, design, construction, and commissioning work as defined in subsequent Task Orders (TOs) issued under the MATOC.

    Contract Vehicle: The Government will award a MATOC Indefinite Delivery/Indefinite Quantity (IDIQ) contract.

    Period of Performance: The MATOC ordering period will be five (5) years from the date of award.

    Competition Strategy: This will be a Full and Open Competition.

    Anticipated RFP Release: The Government anticipates the formal RFP will be released in April 2026.

    Place of Performance: Work at the TO level under the MATOC will be performed at the following GOCO AAPs:

    Holston AAP (HSAAP), Kingsport, TN

    Iowa AAP (IAAAP), Middletown, IA

    Lake City AAP (LCAAP), Independence, MO

    Milan AAP (MLAAP), Milan, TN

    Scranton AAP (SCAAP), Scranton, PA

    Radford AAP (RFAAP), Radford, VA

    Quad City Cartridge Case Facility (QCCCF), Rock Island, IL

    Evaluation Approach

    The Government intends to award a MATOC to all responsible offerors whose proposals are determined to meet or exceed the Minimum Technical Threshold Rating (MTTR). The source selection will be conducted in accordance with Revolutionary FAR Overhaul 15.2, using a Highest Technically Rated Offeror (HTRO) self-scoring methodology. Price will not be an evaluation factor for the MATOC award but will be evaluated at the individual TO level.

    Disclaimer

    This pre-solicitation synopsis is for informational purposes only and is not a request for proposal (RFP). The Government is not seeking proposals at this time. The official RFP, containing all information needed to submit a proposal, will be published on Procurement Integrated Enterprise Environment. Interested parties are responsible for monitoring SAM.gov for the solicitation and any related documents or amendments.

    Key dates

    1. March 24, 2026Posted Date
    2. May 7, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    DESIGN-BUILD AND CONSTRUCTION SERVICES MATOC TO SUPPORT INDUSTRIAL BASE MODERNIZATION AT GOVERNMENT OWNED - CONTRACTOR OPERATED (GOCO) FACILITIES is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.