Closed Solicitation · DEPARTMENT OF AGRICULTURE

    End of the World Long Term Stewardship

    Sol. 12363N25R4014Sources SoughtWashington, DC
    Closed
    STATUS
    Closed
    POSTED
    Mar 26, 2026
    Publication date
    NAICS CODE
    113310
    Primary industry classification
    PSC CODE
    F099
    Product & service classification

    AI Summary

    The U.S. Forest Service is seeking feedback through a Request for Information regarding the End of the World Planning Area. This initiative aims to address forest health issues and improve water quality over a potential 10-year contract. Interested parties are invited to provide insights that will shape future solicitations, focusing on various service work including road maintenance and timber management.

    Contract details

    Solicitation No.
    12363N25R4014
    Notice Type
    Sources Sought
    Posted Date
    March 26, 2026
    Response Deadline
    NAICS Code
    113310AI guide
    PSC / Class Code
    F099
    Contract Code
    12C2
    Sub-Agency
    FOREST SERVICE
    State
    DC
    ZIP Code
    202501138
    AI Product/Service
    service

    Description

    3/26/2026- Share updated draft documents, extend active date and change NAICS 2/2/2026- Share attachments 11 and 12, proposed road reconstruction work in the Jungle Bird contractr area 10/22/2025- Share draft documents and information on second site visit 9/30/2025- Industry meeting notes, PowerPoint, NEPA Record of Decsion and project spatial data shared The U.S. Forest Service is re-issuing this formal Request for Information (RFI) in connection with the Nez Perce-Clearwater National Forest End of the World (EOTW) Planning Area, and potentially other areas across the forest. The objectives of this initiative are to reduce the risks of insect and disease infestation, wildfires, and to restore and improve forest vegetation and water quality. A long-term 10-Year G-Z Integrated Resource Stewardship Contract is being considered to implement treatments in the planning area. The intent of this RFI is to receive feedback from interested parties during the project development stage. Responses will inform the scope, structure, and feasibility of future solicitations. While no contract will be awarded from this RFI, feedback will directly influence project design. Project Overview and Scope: Approximately 17,000 gross acres are available for treatment across the End of the World planning area. The contract term is anticipated to be up to 10 years. The net acres for treatment are expected to be less after unit layout. Approximately 50+ MMBF of commercial timber is anticipated to be offered over the contract life. Types of Service Work may include: Road maintenance, reconditioning, construction, gravel crushing, and decommissioning. Please note that detailed road design activities such as geometric alignment, engineering drawings, and technical specifications will not be included. Timber removal that will include logging operations conducted by tractor, skyline, shovel, or tethered systems and transportation. Timber sale preparation activities which may include harvest unit layout, GPS traversing, unit boundary marking, interior marking and cruising. Temporary road construction and obliteration. Low value stand treatment including precommercial thinning (PCT), mastication, etc. with a volume removal option. Biomass removal that may include thinning non-merchantable material, slashing, chipping, transportation and other related activities. Slash piling, tethered piling, handline and/or mechanical line construction, and fuel break treatments. Anticipated Terms: Minimum timber value estimates will be based on base rates and/or appraised rates if appropriate as determined from the Forest Service’s Timber appraisal system.? Payment terms for service work items are anticipated to be by the acre, ton or linear foot for most treatments. Road maintenance and reconstruction activities may be priced by the mile or contract quantity. The projects may include both mandatory and optional service items; product value at awarded rates will be used to offset the cost-of-service work items. Davis-Bacon wages and certified payrolls will be required for all Road Construction requirements. Service Contract Act wages will apply towards all non-construction service work requirements. Road construction requirements will be subject to bonding at applicable regulatory thresholds. Draft documents are being shared for information and review purposes only. This is NOT a Solicitation Announcement, nor is it a Request for Proposal. This request does not obligate the Government in any contract award. Feedback, comments, or questions regarding the draft documents are welcome and may be submitted to the contact person listed below.

    Key dates

    1. March 26, 2026Posted Date

    AI search tags

    Frequently asked questions

    End of the World Long Term Stewardship is a federal acquisition solicitation issued by DEPARTMENT OF AGRICULTURE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.