Active Solicitation · DEPT OF DEFENSE

    ENVIRONMENTAL ASSESSMENT FOR REPAIR OF OVERHEAD 70KV TRANSMISSION LINE SOUTH LOOP 2 VSFB, CA

    Sol. FA461026_EA_SL2PresolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)VANDENBERG SFB, CA
    Open · 7d remaining
    DAYS TO CLOSE
    7
    closes Jun 30, 2026
    POSTED
    Jun 15, 2026
    Publication date
    NAICS CODE
    541620
    Primary industry classification
    PSC CODE
    F999
    Product & service classification

    AI Summary

    The Department of the Air Force seeks a contractor to prepare a comprehensive Environmental Assessment for the repair of a 70kV transmission line at Vandenberg Space Force Base. The project includes data collection, technical analyses, and coordination with stakeholders, culminating in a legally sufficient EA document. Interested vendors must submit a capability statement by June 30, 2026.

    Contract details

    Solicitation No.
    FA461026_EA_SL2
    Notice Type
    Presolicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    June 15, 2026
    Response Deadline
    June 30, 2026
    NAICS Code
    541620AI guide
    PSC / Class Code
    F999
    Issuing Office
    FA4610 30 CONS PK
    Primary Contact
    Chase French
    State
    CA
    ZIP Code
    93437-5212
    AI Product/Service
    service

    Description

    Based on the Statement of Work, the contractor will provide the services necessary to prepare a comprehensive Environmental Assessment (EA) for the repair of an overhead 70kV transmission line at Vandenberg Space Force Base. This includes project management, data collection, and extensive coordination with government and regulatory stakeholders. The core of the work involves conducting detailed technical analyses of the project's impact on cultural resources, natural resources (including wetlands and special status species), and construction noise. The contractor will produce a series of documents, including a Description of Proposed Action and Alternatives (DOPAA) and various technical reports. Ultimately, this effort will result in a legally sufficient EA document that will lead to a Finding of No Significant Impact (FONSI), a mitigated FONSI, or a determination that a full Environmental Impact Statement (EIS) is necessary. Interested vendors shall submit a capability statement and other relevant information NLT 30 June 2026 at 1400 PDT. 

    Key dates

    1. June 15, 2026Posted Date
    2. June 30, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    ENVIRONMENTAL ASSESSMENT FOR REPAIR OF OVERHEAD 70KV TRANSMISSION LINE SOUTH LOOP 2 VSFB, CA is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.