Active Solicitation · DEPARTMENT OF TRANSPORTATION

    FAA WESTERN & CENTRAL FACILITY DEMOLITION, REMOVAL AND RESTORATION

    Sol. 6913G626R200004Combined Synopsis/SolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)CAMBRIDGE, MA
    Open · 11d remaining
    DAYS TO CLOSE
    11
    closes May 5, 2026
    POSTED
    Apr 10, 2026
    Publication date
    NAICS CODE
    238910
    Primary industry classification
    PSC CODE
    F999
    Product & service classification

    AI Summary

    The FAA is seeking contractors for the demolition, removal, and restoration of facilities no longer in use. The project includes preparing a detailed work plan, obtaining necessary permits, and ensuring compliance with environmental regulations. The work involves the removal of structures and infrastructure, with a focus on safety and adherence to federal, state, and local requirements.

    Contract details

    Solicitation No.
    6913G626R200004
    Notice Type
    Combined Synopsis/Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    April 10, 2026
    Response Deadline
    May 5, 2026
    NAICS Code
    238910AI guide
    PSC / Class Code
    F999
    Primary Contact
    Roland Regan
    State
    MA
    ZIP Code
    02142
    AI Product/Service
    service

    Description

    The FAA no longer uses the equipment/buildings at the above-listed facilities. If the property is leased and there are no co-located facilities, the FAA will typically cancel the leases after the demolition and restoration activities take place. If the property is government-owned, the FAA will either sell the property or repurpose it for further government use. Prior to relinquishing these properties the FAA plans to remove environmental hazards, demolish or remove certain onsite structures and infrastructure, and restore disturbed areas. The DEN TANK is co-located at an active FAA facility complex and only the former tank and related infrastructure is being removed from the property.

    TASKS TO BE PERFORMED

    The Contractor shall conduct all work in accordance with Federal, State and local requirements.  Where inconsistencies exist, the Contractor shall follow the most stringent requirement.

    ​​​​​​​Demolition, Remediation/Removal, and Restoration Work Plan

    The Contractor shall submit a draft Demolition, Removal, and Restoration work plan (Work Plan) within 10 business days after attending a kickoff meeting with the Volpe Center representatives that addresses the project requirements below.

    This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all demolition, debris removal, disposal, and site restoration activities as required and described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished site survey reports for the facilities scheduled for demolition.

    The contractor shall remove and/or demolish on-site structures and infrastructure in accordance with the procedures detailed in the site survey reports and the approved Final Work Plans. The contractor shall obtain all necessary local, state and federal permits for demolition work, complete any required paperwork, and pay any applicable fees unless otherwise discussed with the Government. These permits shall be submitted as an appendix to the work plan unless previously discussed with the Volpe Center.

    Asbestos, lead-based paint (LBP) and PCB in building materials surveys were completed by licensed inspectors. The results are included as government furnished information (GFI). No asbestos-containing materials (ACM) were found at all three FAA facilities. Lead was not found in the soil above the FAA action level of 200 mg/kg at RVS and TJY OMs. LBP was not found on building materials, however, the orange-painted OM antennas at RVS and TJY were not sampled, and based on similar FAA projects, are presumed to contain LBP and shall be disposed as such. (SEE SOLICITATION for details)

    Key dates

    1. April 10, 2026Posted Date
    2. May 5, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    FAA WESTERN & CENTRAL FACILITY DEMOLITION, REMOVAL AND RESTORATION is a federal acquisition solicitation issued by DEPARTMENT OF TRANSPORTATION. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.