Closed Solicitation · DEPARTMENT OF ENERGY
AI Summary
The Department of Energy is seeking a qualified source to conduct a site-wide Fire Hazard Analysis at the Princeton Plasma Physics Laboratory. This analysis must comply with DOE regulations and reflect current conditions. Interested parties must attend a mandatory site visit and pre-proposal meeting to be eligible to submit proposals.
The Princeton Plasma Physics Laboratory (PPPL) is operated by Princeton University on behalf of the U.S. Department of Energy (DOE). soliciting a qualified source to provide a site-wide (C-Site, D-Site and Canal Pump House) Fire Hazard Analysis for DOE. This analysis shall reflect current conditions and to comply with the requirements of DOE Order 420.1C and DOE STD 1066 consideration. This 2024-2025 FHA shall compile all buildings within our facility. A survey of the existing FHA versus the current conditions shall be conducted to evaluate and verify most current conditions.
To be eligible to participate in this solicitation interested parties must submit the acknowledgement form included in the solicitation package.
In order to view solicitation documents you must first download the files to your desktop computed then reopen them for viewing. Please ensure that you are running the most current software version of Adobe Acrobat
A faciliity site visit along with attendance in the pre-proposal zoom tele-conference meeting are mandatory requirements for the acceptance of any proposal.
Project drawings will only be released to firms attending the mandatory site visit
FACILITY FIRE HAZARD ANALYSIS REQUIRED is a federal acquisition solicitation issued by DEPARTMENT OF ENERGY. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.