Closed Solicitation · DEPT OF DEFENSE

    FIMI 3D Well Relocation Construction

    Sol. W912DS25S0045PresolicitationNEW YORK, NY
    Closed
    STATUS
    Closed
    closed Jun 1, 2025
    POSTED
    May 16, 2025
    Publication date
    NAICS CODE
    237110
    Primary industry classification
    PSC CODE
    Y1JZ
    Product & service classification

    AI Summary

    The U.S. Army Corps of Engineers is seeking contractors for the FIMI 3D Well Relocation Construction project in Ocean Beach, NY. This presolicitation involves installing a 1,000 gpm deep well turbine pump and constructing a wood-framed pumphouse on a reinforced concrete foundation. Additional work includes installing a concrete driveway, a manual transfer switch for a generator, and a discharge pipe to connect the well to an existing treatment facility.

    Contract details

    Solicitation No.
    W912DS25S0045
    Notice Type
    Presolicitation
    Posted Date
    May 16, 2025
    Response Deadline
    June 1, 2025
    NAICS Code
    237110AI guide
    PSC / Class Code
    Y1JZ
    Contract Code
    2100
    Issuing Office
    W2SD ENDIST NEW YORK
    Primary Contact
    Michael McCue
    State
    NY
    ZIP Code
    10278-0004
    AI Product/Service
    service

    Description

    The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform construction of the FIMI Contract 3D (Well & Pump House): The new well and pump house of FIMI Contract 3D will be located in the Village of Ocean Beach, Fire island, Town of Islip, Suffolk County, NY. Work will include: a 1,000 gpm deep well turbine pump will be installed at the well and a wood-framed pumphouse will be constructed to shelter the pump discharge head, electric motor, flow meter, piping, valves, and electric switchgear. The pumphouse will sit on a reinforced concrete foundation and a concrete driveway will be installed. A manual transfer switch and receptacle for connection to an on-site generator will be provided. A discharge pipe will be constructed to deliver raw water from the proposed well to the existing treatment facility. After treatment, well water will be connected to the distribution piping.

    Key dates

    1. May 16, 2025Posted Date
    2. June 1, 2025Proposals / Responses Due

    AI search tags

    Frequently asked questions

    FIMI 3D Well Relocation Construction is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.