Closed Solicitation · DEPARTMENT OF AGRICULTURE

    FOREST SERVICE - UPPER LYTLE CREEK ROAD REHAB

    Sol. 127EAW25R0057PresolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)Albuquerque, NM
    Closed
    STATUS
    Closed
    closed Aug 12, 2025
    POSTED
    Jul 28, 2025
    Publication date
    NAICS CODE
    237310
    Primary industry classification
    PSC CODE
    Z2LB
    Product & service classification

    AI Summary

    The USDA Forest Service is preparing a solicitation for road repairs on Upper Lytle Creek Divide Road in the San Bernardino National Forest. The project involves excavation, reinforcement installation, and erosion control measures. Contractors must provide all necessary resources to complete the work in compliance with contract specifications. This is a pre-solicitation notice for informational purposes only.

    Contract details

    Solicitation No.
    127EAW25R0057
    Notice Type
    Presolicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    July 28, 2025
    Response Deadline
    August 12, 2025
    NAICS Code
    237310AI guide
    PSC / Class Code
    Z2LB
    Sub-Agency
    FOREST SERVICE
    Primary Contact
    Tanya Torres
    State
    NM
    ZIP Code
    871023498
    AI Product/Service
    service

    Description

    PRE-SOLICITATION NOTICE

    This pre-solicitation notice is issued for informational purposes only to inform industry of an upcoming project requirement that will be solicited. This is NOT a Request for Proposal (RFP). At this time, no solicitation exists; therefore, please do NOT request a copy of the solicitation, bid documents, specifications, or drawings. Responses or proposals are not required at this stage.

    The USDA Forest Service Procurement and Property Services, Field Procurement Operations, Southwest Zone, Contract Service Area 6, on behalf of Region 5, is currently preparing a solicitation RFP to provide road repairs to various locations on the San Bernardino National Forest.

    The contractor shall repair a washout on Upper Lytle Creek Divide Road (3N31Y) in the Front Country Ranger district of the San Bernardino National Forest. The work involves excavating approximately 12 feet of material along a steep slope, installing primary reinforcement every 3 feet and secondary reinforcement every foot, and resurfacing the road section. The project includes excavating, backfilling, and embankment of road prism failures caused by erosion, installing geogrid fill reinforcement, and placing erosion control mats to stabilize the area.

    The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, non-personal services, and all items necessary to perform the project work and associated contract requirements. All work must be performed in strict compliance with the terms, specifications, drawings, and provisions outlined in the contract.

    Project Location
    Front Country Ranger district of the San Bernardino National Forest.
    Locations of the work site are at coordinates: 34.2709, -117.5022

    Please see attachment for additional information.

    Key dates

    1. July 28, 2025Posted Date
    2. August 12, 2025Proposals / Responses Due

    AI search tags

    Frequently asked questions

    FOREST SERVICE - UPPER LYTLE CREEK ROAD REHAB is a federal acquisition solicitation issued by DEPARTMENT OF AGRICULTURE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.