Active Solicitation · DEPT OF DEFENSE

    Fort Lee Vehicle Recovery Range

    Sol. W9123626BA006SolicitationSet-aside: 8a CompetedNORFOLK, VA
    Open · 15d remaining
    DAYS TO CLOSE
    15
    closes Jul 28, 2026
    POSTED
    Jun 29, 2026
    Publication date
    NAICS CODE
    236220
    Primary industry classification
    PSC CODE
    Y1PZ
    Product & service classification

    AI Summary

    The Department of Defense is soliciting proposals for the construction of 24 concrete turning pads at Fort Lee, including site drainage improvements and road alignment. The project will be executed in three phases, with specific access restrictions. Completion of each phase is mandatory before proceeding to the next, and the Army will conduct training operations concurrently.

    Contract details

    Solicitation No.
    W9123626BA006
    Notice Type
    Solicitation
    Set-Aside
    8a Competed
    Posted Date
    June 29, 2026
    Response Deadline
    July 28, 2026
    NAICS Code
    236220AI guide
    PSC / Class Code
    Y1PZ
    Contract Code
    2100
    Issuing Office
    W2SD ENDIST NORFOLK
    Primary Contact
    Michael Stevenson
    State
    VA
    ZIP Code
    23510-1096
    AI Product/Service
    service

    Description

    Amendment 0001: An amenedment has been made to Solicitation W9123626BA0006. Please see attachment SF30, Solicitation Amendment W9123626BA006_0001, to view the summary of changes, including site visit information. The purpose of this project is to construct 24 concrete turning pads, along with required site drainage improvements and road alignment and repair as necessary. The contract will be executed in three distinct phases, with the contractor granted access to only one phase at a time. Completion of each phase is required before proceeding to the next. The remaining phases (two and three) will only be performed if the options for phases are exercised. During construction activities in one phase, the Army will conduct training operations in the remaining two phases. Each turning pad, as identified in the project drawings, will require excavation of the existing roadbed and placement of concrete in accordance with the design specifications. Storm drainage systems will be installed to ensure positive site drainage throughout the construction process. Upon proper curing of the concrete turning pads, the connecting roads will be regarded and aligned to seamlessly integrate with the pads, as detailed in the contract drawings.

    Key dates

    1. June 29, 2026Posted Date
    2. July 28, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    Fort Lee Vehicle Recovery Range is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.