This project involves upgrading and modifying the low voltage electrical and lighting systems at Eielson's Central Heat Power Plant. The work includes the removal and replacement of outdated electrical panels and lighting fixtures. A site visit is scheduled for December 16, 2025, and electronic bids are due by January 20, 2026.
The purpose of this project is to upgrade and modify the low voltage electrical and lighting systems at Eielson's Central Heat Power Plant (CHPP) to include removal, and replacement of the existing electrical panels, associated transformers, and the remainder of existing outdated lighting fixtures within CHPP facility at Eielson AFB.
A site visit will be conducted on 16 December 2025, 10:00 AM AKDT Participants will meet at-
Please submit the names of the individuals that will be in attendance to SrA Christopher Blackburn and Mr. Ryan Smith at 354CONS.PKA.MonitorConstruction@us.af.mil by 02:00 PM AKDT on 15 December 2025.
Questions are due no later than 19 December 2025 at 02:00PM AKDT. All questions will be answered in the form of an amendment to the solicitation and posted to SAM.gov website.
IAW with FAR 14.202-8 Electronic bids, ONLY ELECTRONIC submissions will be accepted. Bids must be submitted via email to BOTH of the following individuals on or before 20 January 2026 at 02:00PM AKDT:
A. The NAICS code is 238210 with a Small Business Size Standard of $19M.
B. The magnitude for this requirement IAW FAR 36.204(f) is between $1,000,000.00 and $5,000,000.
C. See Section J for the List Attachments.
D. Payment and Performance bonds shall be obtained IAW FAR 28.102.
FTQW 20 0504 2 CHPP ELECTRICAL UPGRADES is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.