Closed Solicitation · DEPARTMENT OF AGRICULTURE

    FY25 GAOA HORSESHOE CREEK TRAIL BRIDGE INSTALL.

    Sol. 1240LU25Q0013SolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)BOZEMAN, MT
    Closed
    STATUS
    Closed
    closed Jun 30, 2025
    POSTED
    Jun 11, 2025
    Publication date
    NAICS CODE
    237310
    Primary industry classification
    PSC CODE
    Y1LB
    Product & service classification

    AI Summary

    The Department of Agriculture's Forest Service is soliciting bids for the installation of a new trail bridge at Horseshoe Creek within the Custer Gallatin National Forest. Contractors are required to provide sills and diaphragms, remove existing sills, and install various components, while the government will supply most materials. Optional items include complete bridge installation and approach work, with specific requirements for grades and gabion basket usage. Bids are due by June 30, 2025.

    Contract details

    Solicitation No.
    1240LU25Q0013
    Notice Type
    Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    June 11, 2025
    Response Deadline
    June 30, 2025
    NAICS Code
    237310AI guide
    PSC / Class Code
    Y1LB
    Contract Code
    12C2
    Sub-Agency
    FOREST SERVICE
    Primary Contact
    Karen Carleton
    State
    MT
    ZIP Code
    59715

    Description

    The scope of this project is to deliver the bridge items needed to install a new trail bridge, Horseshoe Creek, on the Custer Gallatin National Forest on the Beartooth Ranger District. BASE ITEMS: Contractor shall provide both sills and all (20) diaphragms, (See attached drawings for dimensions), remove and dispose of the old existing sills, and install the stringers, sills, diaphragms and all fasteners for these items. This contract includes delivering other Government furnished material to bridge location, which includes stringers, decking, curb, wearing surface material, and other applicable hardware. The Government will provide all material except Sills and Diaphragms. Government furnished material will be available at the Meyers Creek Administration site upon request. OPTION ITEMS: Option items will be for complete bridge installation to be able to open the bridge up to the public. These optional items include deck, curb, running planks, and applicable hardware installation, approach work, and new trail construction to tie the trail into the new bridge approaches. Approach grades shall be no steeper than 30%. Approach work does include gabion basket installation on the North approach. Gabion baskets are available onsite to aid in approach construction and minimize embankment. Gabion baskets not used in the approach work shall be returned to Meyers Creek Site.

    Key dates

    1. June 11, 2025Posted Date
    2. June 30, 2025Proposals / Responses Due

    Frequently asked questions

    FY25 GAOA HORSESHOE CREEK TRAIL BRIDGE INSTALL. is a federal acquisition solicitation issued by DEPARTMENT OF AGRICULTURE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.