Closed Solicitation · DEPT OF DEFENSE
AI Summary
The FY26 North Myrtle Beach Ocean Outfall project involves upgrading the stormwater collection and conveyance system in North Myrtle Beach, South Carolina. This design-build contract will be coordinated with a separate project to enhance the landward portion of the stormwater system. Proposals are due by January 14, 2026.
PROJECT TITLE: FY26 - NORTH MYRTLE BEACH OCEAN OUTFALL (17 AVE S) PROJECT LOCATION: NORTH MYRTLE BEACH, SOUTH CAROLINADESCRIPTION OF WORK: THE DEEPWATER OCEAN OUTFALL IS A PROJECT TO UPGRADE THE STORMWATER COLLECTION AND CONVEYANCE SYSTEM IN A COASTAL URBAN AREA OF NORTH MYRTLE BEACH, SOUTH CAROLINA. THIS DEEPWATER OCEAN OUTFALL WILL BE DESIGNED AND CONSTRUCTED BY THE SAME CONTRACTOR ON ONE DESIGN-BUILD CONTRACT. IT WILL BE COORDINATED IN TANDEM WITH A SEPARATELY CONTRACTED PROJECT TO UPGRADE THE LANDWARD PORTION OF THE STORMWATER SYSTEM THAT WILL CONSOLIDATE AND REROUTE DRAINAGE INLETS AND PIPES ALONG THE STREET AND OTHER OPEN AREAS. THIS SOLICITATION IS HEREBY POSTED AS OF 18 NOVEMBER 2025. The purpose of this Amendment 0001 is to extend the proposal due date to 14 January 2026 and to provide a Project Description See Attachment 6. This Amendment is hereby posted as of 29 December 2025.
FY26 - NORTH MYRTLE BEACH OCEAN OUTFALL (17 AVE S) is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.