Active Solicitation · DEPT OF DEFENSE

    FY26 SAVANNAH INNER HARBOR MAINTENANCE DREDGING PROJECT

    Sol. W912HN26BA006PresolicitationSAVANNAH, GA
    Open · 13d remaining
    DAYS TO CLOSE
    13
    closes May 28, 2026
    POSTED
    May 14, 2026
    Publication date
    NAICS CODE
    237990
    Primary industry classification
    PSC CODE
    Z1KF
    Product & service classification

    AI Summary

    The Savannah Inner Harbor Maintenance Dredging Project involves construction services for maintenance dredging, including personnel, equipment, and materials. The project will remove up to 5.6 million cubic yards of material over one year, with specific environmental considerations and disposal requirements. Contractors must coordinate with existing operations and adhere to environmental windows for dredging activities.

    Contract details

    Solicitation No.
    W912HN26BA006
    Notice Type
    Presolicitation
    Posted Date
    May 14, 2026
    Response Deadline
    May 28, 2026
    NAICS Code
    237990AI guide
    PSC / Class Code
    Z1KF
    Issuing Office
    W074 ENDIST SAVANNAH
    Primary Contact
    Rohan Bryan
    State
    GA
    ZIP Code
    31401-3604
    AI Product/Service
    service

    Description

    The Savannah Inner Harbor Dredging Contract provides construction services, including furnishing personnel, transportation, mobilization/demobilization, equipments/materials required in connection with maintenance dredging. This contract is traditionally performed with a hydraulic cutterhead dredge, the duration is expected to be one year from Notice to Proceed. Up to five million, six hundred thousand cubic yards of maintenance material is expected to be removed from the inner harbor. The work is located in the deep draft Savannah Harbor navigation project in Georgia in the vicinity of Chatham County, Georgia (GA) / Jasper County, South Carolina (SC). The Savannah Inner Harbor channel is 47 ft. deep MLLW / 500 ft. wide to the upper end of Kings Island Turning Basin: 36 ft. deep MLLW / 400 ft. wide to the upper end of Argyle Island Turning Basin; 30 ft. deep MLLW 200 ft. wide to the upper limit of the project. Savannah Harbor?s Kings Island Turning Basin (KITB) is the primary turning basin for large civilian / military ships, lying adjacent to the Georgia Ports Authority docks. KITB requires dredging twice a year to allow the loaded ships to freely turn when using the port. Up to 1.5 million cubic yards of maintenance material are removed from the KITB annually.Other contractor(s) may be working for the Savannah District on the Savannah Harbor, to include confined upland dredged material containment areas / designated staging areas. If such work occurs, the contractors shall coordinate activities under the direction of the Contracting Officer.A majority of the material dredged from the Savannah Inner Harbor must be placed in upland confined disposal areas adjacent to the Savannah River. Savannah confined upland disposal areas DMCAs 12A, 13A, 13B / Jones Oysterbed Island are owned by local sponsor Georgia Department of Transportation. Disposal areas DMCAs 14A / 14B are owned by the Joint Project Office of the Georgia / South Carolina Port Authorities. Portions of DMCAs 2A / Jones/Oysterbed are owned by the Georgia Department of Transportation / the US Fish / Wildlife Service. DMCA 1N is owned entirely by the US Fish / Wildlife Service. The Federal Government holds existing easements on all confined upland disposal areas in the Savannah Harbor except DMCA 1N which has a Memorandum of Understanding. Environmental windows limit the timing of dredging in the Savannah Inner Harbor. The environmental windows in Savannah include a Striped Bass spawning window between dates 1 April through 15 May which limits the amount / timing of dredging above station 63+360 (River Mile 12), / a dissolved oxygen window (approximately July 1 through September 30). To protect sturgeon aggregation areas in the upper river, no dredging is allowed above STA 105+500 1 May through 31 October. Certain reaches of O/M sediments may contain cadmium (Cd) in levels significant enough to harm foraging avian species in the DMCAs. Therefore, O/M sediments in those reaches will be tested by the Government prior to dredging. If Cd is found in those sediments equal to or greater than 14 mg/kg, then options will be exercised that include disposal of the sediments in specific DMCAs under special handling conditions.Obstructions are objects or materials in the required side slope cross sections or in the existing ground surface which are unknown at the time of encounter by the dredge or identified by pre / post hydrographic surveys, / monthly condition surveys. Obstructions are objects which cannot be removed by a hydraulic pipeline dredge. The Contractor may encounter obstructions during dredging operations / must remove the objects or materials to provide the required section as shown on the cross-section plates. If the Contractor is performing maintenance dredging with a pipeline dredge, the dredge must act as a probe for obstructions. The object removed will be the property of the Contractor unless it has been determined to be culturally significant. The base contract will include mobilization/demobilization, maintenance dredging, moves, dive team diving, / equipment rental for obstruction removal. Contract options include Cd dredging with placement to the backside of DMCA 14B / maintenance dredging as cap material placed on top of the Cd dredged material.

    Key dates

    1. May 14, 2026Posted Date
    2. May 28, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    FY26 SAVANNAH INNER HARBOR MAINTENANCE DREDGING PROJECT is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.