Closed Solicitation · DEPT OF DEFENSE

    GATE BARRIER PLC REPLACEMENT

    Sol. FA485525BarrierMantinenceSolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)CANNON AFB, NM
    Closed
    STATUS
    Closed
    closed Sep 18, 2025
    POSTED
    Sep 15, 2025
    Publication date
    NAICS CODE
    561621
    Primary industry classification
    PSC CODE
    6150
    Product & service classification

    AI Summary

    The Department of Defense is seeking a contractor to replace inoperable PLCs at Cannon AFB's main gate. The project involves engineering new PLC programs, installing MicroLogix PLCs, and debugging the control system. A Field Engineer will be required on-site for installation and testing, with revised electrical drawings due four weeks post-completion.

    Contract details

    Solicitation No.
    FA485525BarrierMantinence
    Notice Type
    Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    September 15, 2025
    Response Deadline
    September 18, 2025
    NAICS Code
    561621AI guide
    PSC / Class Code
    6150
    Issuing Office
    FA4855 27 SOCONS LGC
    Primary Contact
    Joshua Cameron
    State
    NM
    ZIP Code
    88103-5321
    AI Product/Service
    service

    Description

    The PLCs for the barrier system at Cannon AFB, main gate are inoperable. 27 SOCES are looking to engineer and revise PLC programs in the currently installed M238 MOOG PLCs to retrofit them to work off modern MicroLogix software to overcome the obsolete MODICON PLCs. Once the new programs have been revised and installed on new MicroLogix PLCs, a Field Engineer will be needed to travel to the customer's site, Cannon AFB, to install the new components in all 5 wedge barrier control panels. Once the new PLCs and I/O modules have been installed, the Field Engineer will begin the debug process to ensure that the new control system operates properly. A final test and turnover will be done prior to departure from the site. Within 4 weeks after the project is complete, the vendor's Engineers will provide revised electrical drawings that will be submitted to Cannon AFB point of contact. 

    Key dates

    1. September 15, 2025Posted Date
    2. September 18, 2025Proposals / Responses Due

    AI search tags

    Frequently asked questions

    GATE BARRIER PLC REPLACEMENT is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.