Active Solicitation · DEPT OF DEFENSE

    GAVINS POINT RAW WATER INTAKE ZEBRA MUSSEL MITIGATION

    Sol. W9128F26QA074SolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)OMAHA, NE
    Open · 26d remaining
    DAYS TO CLOSE
    26
    closes Aug 31, 2026
    POSTED
    Jul 29, 2026
    Publication date
    NAICS CODE
    237110
    Primary industry classification
    PSC CODE
    Z2KA
    Product & service classification

    AI Summary

    The U.S. Army Corps of Engineers is soliciting proposals for the Gavins Point Raw Water Intake Zebra Mussel Mitigation project. This project involves designing and installing a zebra mussel abatement system, including labor, equipment, and materials. The estimated cost is between $250,000 and $500,000, with a completion timeline of 210 days post-award. A site visit is scheduled for August 5, 2026.

    Contract details

    Solicitation No.
    W9128F26QA074
    Notice Type
    Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    July 29, 2026
    Response Deadline
    August 31, 2026
    NAICS Code
    237110AI guide
    PSC / Class Code
    Z2KA
    Issuing Office
    W071 ENDIST OMAHA
    Primary Contact
    Brianna WOHLERS
    City
    OMAHA
    State
    NE
    ZIP Code
    68102-4901
    AI Product/Service
    both

    Description

    ***UPDATE 7/29/26: Posted Amendment 0001 to the Solicitation. This Amendment incorporates the Solicitation Drawings attachment to the Solicitation. The U.S. Army Corps of Engineers, Omaha District, hereby announces the solicitation for Gavins Point Raw Water Intake Zebra Mussel Mitigation. The solicitation will close on 31 August 2026. The solicitation is restricted to Small Businesses. A Site Visit is scheduled and additional information regarding the site visit is provided in the solicitation via FAR Clause 52.236-27. The site visit is scheduled for 05 August 2026. The scope of this project is to design a zebra mussel abatement system to protect the powerhouse raw water intakes and intake piping. The contractor will supply all labor, equipment, and materials for installation of a new zebra mussel mitigation system. Significant features of this design include installation of two local tank skids and integral spill containment pallets, installation of two pump skids for distribution, power supply to distribution pumps and ancillary distribution system equipment, and interfacing of distribution pumps with existing raw water flow meters. The Contractor will be required to commence work upon receipt of contract award and complete the work 210 calendar days after receipt of Notice to Proceed, this is subject to change after solicitation issuance. The estimated construction cost of this project is between $250,000 and $500,000. The Primary North American Industry Classification System (NAICS) code for this solicitation is 237110, Water and Sewer Line and Related Structures Construction, with a size standard for Small Business of $45M. The Contracting Office is USACE Omaha District, located at 616 Capital Ave, Omaha, NE 68102. All questions pertaining to this solicitation shall be submitted on ProjNet (ProjNet access, and additional guidance are contained within the solicitation). The place of performance is Gavins Point Project, Crofton, NE 68730.

    Key dates

    1. July 29, 2026Posted Date
    2. August 31, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    GAVINS POINT RAW WATER INTAKE ZEBRA MUSSEL MITIGATION is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.