Closed Solicitation · DEPT OF DEFENSE

    GBSD Integrated Command Center - FE Warren AFB

    Sol. W9128F23R0022SolicitationSet-aside: nanOMAHA, NE
    Closed
    STATUS
    Closed
    closed Jul 31, 2023
    POSTED
    Jun 30, 2023
    Publication date
    NAICS CODE
    236220
    Primary industry classification
    PSC CODE
    Y1JZ
    Product & service classification

    Contract details

    Solicitation No.
    W9128F23R0022
    Notice Type
    Solicitation
    Set-Aside
    nan
    Posted Date
    June 30, 2023
    Response Deadline
    July 31, 2023
    NAICS Code
    236220AI guide
    PSC / Class Code
    Y1JZ
    Contract Code
    2100
    Issuing Office
    W071 ENDIST OMAHA
    Primary Contact
    Scott Dwyer
    City
    OMAHA
    State
    NE
    ZIP Code
    68102-4901

    Award information

    Awardee
    nan
    Award Date

    Description

    ***AM-0001 - Revised DIV 22 and updated header to CUI/NOFORN*** ***Specifications and Drawings are CUI/NOFORN and must be requested via DoD SAFE, in order to access drawings proof of U.S. Citizenship must be provided by the requester via, (1) Birth Certificate, (2) U.S. Passport, (3) Certifiacte of Citizenship or (4) Naturalization Certificate*** This solicitation is UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION. The construction acquisition method is design-bid-build (construction). Project Description: This project consists of renovating an approximate 60,000 Square Foot (SF) facility to support the Ground Based Strategic Deterrent (GBSD) Intercontinental Ballistic Missile mission at F.E. Warren Air Force Base. This project will include a space or spaces constructed to secure area standard Intelligence Community Directive/Intelligence Community Standard 705 (ICD/ICS 705) See 01 14 00 WORK RESTRICTIONS for additional information and requirements. This project will include space or spaces for emergency power, High-altitude Electromagnetic Pulse (HEMP), and Chemical, Biological, Radiological protection measures. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The facility should be compatible with applicable DoD, Air Force, and base design standards. In addition, local materials and construction techniques shall be used where cost effective. This project will comply with DoD antiterrorism/force protection requirements per unified facilities criteria. All work shall be in accordance with RFP documents issued within this solicitation. The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work within 900 calendar days after receipt of NTP. Clauses will be included for Liquidated Damages in case of failure to complete the work in the time allowed. Performance and Payment Bonds will be required. The magnitude of construction costs for this project is between $100,000,000 and $250,000,000.

    Key dates

    1. June 30, 2023Posted Date
    2. July 31, 2023Proposals / Responses Due

    Frequently asked questions

    GBSD Integrated Command Center - FE Warren AFB is a federal contract award from DEPT OF DEFENSE. Review the award details including the awardee, contract value, and NAICS code.