Closed Solicitation · DEPARTMENT OF THE INTERIOR

    56--GRAVEL - PIEDMONT NWR, GA

    Sol. 140F0S25Q0027Combined Synopsis/SolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)Falls Church, VA
    Closed
    STATUS
    Closed
    closed Aug 18, 2025
    POSTED
    Aug 13, 2025
    Publication date
    NAICS CODE
    212319
    Primary industry classification
    PSC CODE
    5610
    Product & service classification

    AI Summary

    The U.S. Fish and Wildlife Service is soliciting bids for the delivery of 6,500 tons of General Aggregate Base (GAB), 3,200 tons of #57 stone, and 80 tons of GDOT type 3 riprap to Piedmont National Wildlife Refuge, GA. Delivery will occur in two phases, with specific requirements for load quantities and material depth. Interested vendors must provide pricing, delivery confirmations, and a statement of understanding regarding material standards. Questions and responses should be directed to Robert_Sung@fws.gov, referencing "140F0S25Q0027 - Gravel for Piedmont NWR."

    Contract details

    Solicitation No.
    140F0S25Q0027
    Notice Type
    Combined Synopsis/Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    August 13, 2025
    Response Deadline
    August 18, 2025
    NAICS Code
    212319AI guide
    PSC / Class Code
    5610
    Issuing Office
    FWS, OVER SAT G/S
    Primary Contact
    Sung, Robert
    State
    VA
    ZIP Code
    22041

    Description

    This is a combined synopsis/solicitation for 6,500 tons of Georgia Department of Transportation standard General Aggregate Base (GAB) with fines, 3,200 tons of #57 stone, and 80 tons of GDOT type 3 riprap with delivery to Piedmont National Wildlife Refuge, GA.

    NOTE: Material delivery will be done in two phases:
    1) Phase one, Delivery and tailgate spread of #57 stone, government will perform all roadway rehabilitation utilizing delivered materials. #57 stone is to be spread to a 3-4" depth. Supply of #57 stone is to meet a minimum of 30 loads per day.
    2) Phase two, Delivery and tailgate spread of GAB, government will perform all roadway rehabilitation utilizing delivered materials. GAB is to be spread to a 5-6" depth. Supply of GAB is to meet a minimum of 30 loads per day.



    See attached SOW in solicitation packet.

    Vendors are asked to provide:
    1. Pricing
    2. Confirmation of delivery dates or indicate alternate dates for consideration (after deer season)
    3. Statement that the vendor understands the standard for Georgia Department of Transportation standard General Aggregate Base (GAB), #57 stone, and Type 3 RipRap.
    4. CAGE Code

    Please identify "140F0S25Q0027 - Gravel for Piedmont NWR" in the subject line of your email

    Submit your questions and responses to Robert_Sung@fws.gov

    Key dates

    1. August 13, 2025Posted Date
    2. August 18, 2025Proposals / Responses Due

    Frequently asked questions

    56--GRAVEL - PIEDMONT NWR, GA is a federal acquisition solicitation issued by DEPARTMENT OF THE INTERIOR. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.