    AI Summary

    The National Oceanic and Atmospheric Administration is seeking bids for the design-build project focused on building and site improvements at the Hawaiian Islands Humpback Whale National Marine Sanctuary in Kihei, Hawaii. The project involves renovations to three existing buildings, including roof and window replacements, interior renovations, and upgrades to HVAC and fire safety systems. Interested bidders should note the presolicitation date of February 5, 2025, and the NAICS code 236220.

    Contract details

    Solicitation No.
    1305M4-25-R-0007
    Notice Type
    Presolicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    April 2, 2025
    Response Deadline
    February 5, 2025
    NAICS Code
    236220AI guide
    PSC / Class Code
    Z2AZ
    Contract Code
    1330
    Issuing Office
    DEPT OF COMMERCE NOAA
    Primary Contact
    Ronette McBean-Felder
    State
    MD
    ZIP Code
    20910

    Description

    Project Description - Generally described as follows but not limited to:

    A brief description of the existing three (3) buildings and site, and anticipated basic scope are provided below:

    Visitor Center Building:

    • Approximately 2,550 GSF
    • Built in the 1940s, interior completely renovated and partial exterior renovation in 2011.  Lead based paint on exterior remediated 2017.
    • Two-story with visitor center on first floor and offices on second floor and in the third story/cupola.
    • Situated on shoreline with exposure to strong daily winds and blowing sand.
    • Historic fishpond, rocky coastline, and near shore reef flat provide some protection from wave action and shoreline erosion.
    • Anticipated scope includes: roof replacement, window replacement, PV system replacement, and minor interior renovations.

    Learning Center Building:

    • Approximately 4,600 GSF
    • Built in 2009
    • Elevated one-story building with garage, offices, public restrooms, multipurpose conference room, storage.
    • Anticipated scope includes: complete interior renovation to accommodate programmatic changes, roofing replacement, window replacement, PV system replacement, complete HVAC replacement, fire alarm system replacement, adding a fire sprinkler system, and other miscellaneous repair items.

    Classroom/Office Building:

    • Approximately 1,900 GSF
    • Built in the 1950s. Concrete block building was renovated in 2013 with exterior siding and flood protections
    • Anticipated scope includes: complete interior renovation to accommodate programmatic changes, raising the existing floor level to mitigate flooding risk, provision of new flood gates, roofing replacement, window replacement, exterior painting, PV system replacement, complete HVAC replacement, electrical improvements, fire alarm system improvements, and other miscellaneous repair items.

    Site Improvements:

    • Complete replacement and regrading of the parking lot to provide positive drainage and mitigate flooding/ponding, including permeable surfaces where possible.
    • Address existing site drainage issues through renovation of existing French drain, addition of swales, improved drainage, addition of landscaping, and other approaches.
    • Provide/replace water lines to existing facilities, including a new fire water line to Learning Center.  
    • Retain or improve existing sand storage.  
    • Provide a new 6-10 car covered parking structure with PV on the roof, with a minimum of 1 enclosed secure parking space, and EV charging for a minimum of 1 vehicle
    • Provide safe and improved pedestrian access to and through the site.  
    • Electrical conduit upgrade.
    • Other potential underground utility replacements and repairs.

    The proposed contract will consist of Contract Line Item Number (CLIN) 0001 for all Design and Preconstruction Services and CLIN 0002 for all Demolition and Construction work.  The contract may include additional Option CLINs for additional scope items that can be added to the scope if funding becomes available.

    This is a new requirement for design-build services for the HIHWNMS Campus. The solicitations and resulting contract will provide all design and construction services for the HIHWNMS Building and Site Improvement Project.

    See Attachment for Additional information. 

    Key dates

    1. April 2, 2025Posted Date
    2. February 5, 2025Proposals / Responses Due

    Frequently asked questions

    HAWAIIAN ISLANDS HUMPBACK WHALE NATIONAL MARINE SANCTUARY BUILDING AND SITE IMPROVEMENTS DESIGN-BUILD PROJECT, IN KIHEI, HAWAII is a federal acquisition solicitation issued by DEPARTMENT OF COMMERCE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.