Closed Solicitation · DEPARTMENT OF AGRICULTURE

    HELENA-LEWIS AND CLARK NATIONAL FOREST GIPSY LAKE DAY USE IMPROVEMENTS

    Sol. 1240LU26Q0028Combined Synopsis/SolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)Ogden, UT
    Closed
    STATUS
    Closed
    closed Mar 13, 2026
    POSTED
    Apr 9, 2026
    Publication date
    NAICS CODE
    237990
    Primary industry classification
    PSC CODE
    Y1LB
    Product & service classification

    AI Summary

    The Helena-Lewis and Clark National Forest is seeking improvements at the Gipsy Lake Day Use site, including the construction of new parking and living areas. The project involves excavation, grading, and installation of new furnishings. The opportunity is a combined synopsis/solicitation and is not under FAR Part 13. The responses are due by March 13, 2026.

    Contract details

    Solicitation No.
    1240LU26Q0028
    Notice Type
    Combined Synopsis/Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    April 9, 2026
    Response Deadline
    March 13, 2026
    NAICS Code
    237990AI guide
    PSC / Class Code
    Y1LB
    Sub-Agency
    FOREST SERVICE
    Primary Contact
    Daniel Franco
    City
    Ogden
    State
    UT
    ZIP Code
    844012310
    AI Product/Service
    both

    Description

    04/09/2026

    Award Ressults for 1240LU26C0014 Helena-Lewis and Clark National Forest Gipsy Lake Day Use Improvements:

    Awarded to Green Wing Excavation LLC on 04/09/2026. Awarded Base (Site 1) + Option 1 (Site 2) + Option 2 (Site 3), for the full amount of $41,929.00.  24 quotes were received.

    Amendment 01

    Extend the "Responses Due Date" from 03/06/2026 by noon MST to 03/13/2026 by noon MST.

    Description:

    This project consists of constructing new parking and living areas at the Gipsy Lake Day Use site on the Townsend Ranger District. Construction of each new site will require excavation and grading work that will balance cut and fill for a natural fit into the landscape. Each site will include all new furnishings as shown in the drawings.


    BASE BID – SITE 1
    Construct a double wide parking area with two living areas.
    Remove 4 large trees. Lop and scatter as shown on drawings for erosion control.


    OPTION 01 – SITE 2
    Construct a single wide parking area with one living area.
    Install 2 new culverts.
    Construct a new ditch.


    OPTION 02 – SITE 3
    Construct a single wide parking area with one living area.
    Install barrier rocks (government furnished).

    Key dates

    1. April 9, 2026Posted Date
    2. March 13, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    HELENA-LEWIS AND CLARK NATIONAL FOREST GIPSY LAKE DAY USE IMPROVEMENTS is a federal acquisition solicitation issued by DEPARTMENT OF AGRICULTURE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.