Closed Solicitation · DEPT OF DEFENSE
AI Summary
The Department of Defense, specifically the Department of the Army, is soliciting bids for a project involving the replacement of hydraulic pumps and reservoir components, as well as the repacking of hydraulic cylinder shafts at the water control tower located at Rough River Lake in Breckinridge County, Kentucky. The project requires the removal and replacement of two hydraulic pumps, two electric motors, one oil storage tank, and all supporting components of the hydraulic system, along with the repacking of three cylinder shafts. Contractors must provide all necessary personnel, materials, tools, equipment, and labor, and are responsible for planning, management, and quality control
The scope of work will include the removal and replacement of two hydraulic pumps, two electric motors, one oil storage tank and all components that support the hydraulic system and repack (3) three-cylinder shafts in the water control tower. All work is located at the Rough River Lake Project water control tower, Breckinridge County, Kentucky.The contractor shall furnish all personnel, materials, supplies, tools, parts, equipment, transportation, labor ,and incidentals necessary to perform the following work listed below per the specifications herein. The contractor?s work and responsibility shall also include all planning, programming, administration, management, supervision, communications, engineering, and quality control. Mobilization, de-mobilization, and delivery of all materials, and equipment shall be included in the price. The contractor shall be responsible for all permits, both local, state, and federal at no expense to the government. All design, material, and work shall be in strict accordance with the specification in this contract and comply with all applicable Federal, State and Local laws and regulations. Please note, all distances and measurements provided are approximate. It is the contractor?s responsibility to field verify all measurements and calculations. Access to the site and coordination for construction is through the USACE Rough River Lake office. See section 8 Technical Points of Contact and Project Representatives for contact information. It is incumbent upon the contractor to attend the pre-bid meeting and visit the site to work out details of equipment storage and staging of materials with the TPOC, Maintenance Leader, and/or Lake Manager. Work under this contract will begin within 10 calendar days of Notice to Proceed (NTP) and complete within 120 calendar days after receiving the NTP. Hours of Work will be 6:30 a.m. ? 4:00 p.m., Monday thru Friday. Exceptions to these hours may be arranged in advance. The contractor will be required to restore all areas disturbed by contractor?s actions to its original condition.Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on View FFP Contract Changes Playbook Here Amendment 001 - Posted 14 August 2024 - Revision of Statement of Work & Price Breakout Schedule.
HYDRAULIC PUMPS/RESERVOIR REPLACEMENT AND HYDRAULIC CYLINDER SHAFT REPACKING IN WATER CONTROL TOWER LOCATED AT ROUGH RIVER LAKE, KENTUCKY. is a federal contract award from DEPT OF DEFENSE. Review the award details including the awardee, contract value, and NAICS code.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.