Closed Solicitation · DEPARTMENT OF HEALTH AND HUMAN SERVICES

    Installation of Custom Turtle Shell Equipment Protection Shields for Laboratory Equipment – Building 10, Tenth Floor B & N Corridor

    Sol. 75N98026Q00835PresolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)BETHESDA, MD
    Closed
    STATUS
    Closed
    closed Jul 30, 2026
    POSTED
    Jul 20, 2026
    Publication date
    NAICS CODE
    332999
    Primary industry classification
    PSC CODE
    R499
    Product & service classification

    AI Summary

    The Department of Health and Human Services seeks a contractor to install sixteen equipment protection shields in Building 10, Tenth Floor, B & N Corridor. This installation aims to safeguard laboratory equipment from water damage, ensuring uninterrupted research operations. The contractor must adhere to NIH Fire Code policies and provide precise installations to enhance laboratory efficiency and protect valuable scientific equipment.

    Contract details

    Solicitation No.
    75N98026Q00835
    Notice Type
    Presolicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    July 20, 2026
    Response Deadline
    July 30, 2026
    NAICS Code
    332999AI guide
    PSC / Class Code
    R499
    Contract Code
    7529
    Primary Contact
    John Burton
    State
    MD
    ZIP Code
    20892
    AI Product/Service
    service

    Description

    Requirements: SCOPE: The requested service under this contract is to install sixteen (16) equipment protection shields in Building 10, Tenth Floor, B & N Corridor. The installation of these protective shields will help safeguard valuable laboratory equipment from potential water and leak damage. Over the past several months, building 10 has experienced multiple flooding and leak-related incidents that have negatively impacted laboratory operations and placed critical research equipment at risk. Installing these equipment protection shields will improve the overall efficiency and continuity of laboratory operations by acting as a protective barrier against water damage. This will help prevent interruptions to research activities, reduce the need for costly equipment repairs, and ensure uninterrupted scientific progress. In addition, the shields will help maintain a stable and protected research environment, ensuring the reliability and accuracy of experimental work within Building 10, Tenth Floor, B & N Corridor. Please see the attached Proposal # 260644 for further details. BACKGROUND INFORMATION: The contractor has previously provided protective shielding installations for various institutes across NIH, including the National Institute of Child Health and Human Development (NICHD). NICHD selected this contractor due to its strong reputation for providing precise and reliable installations that protect sensitive laboratory equipment. The contractor conducts onsite assessments to obtain accurate measurements and ensure all installations meet the strict operational requirements of NIH facilities. In addition, the contractor strictly adheres to all applicable NIH Fire Code policies during each installation. Building 10 has experienced recurring leaks and flooding issues for many years, resulting in damage to laboratory equipment and disruptions to important research activities. By utilizing the contractor’s protective shielding products, the laboratory equipment located within the Tenth Floor B & N Corridor can be better protected against future water-related incidents. This proactive solution will help preserve valuable scientific equipment, minimize downtime, protect research integrity, and allow laboratory operations to continue without interruption. PURPOSE AND OBJECTIVES OF THE ACQUISITION: The purpose of the installation of the equipment protection shields is to protect valuable lab equipment from water damage and improve the progress of lab work. Additionally, the shields will assure the dependability and accuracy of experimental results by establishing an operational laboratory without any accidents stopping it. The purchase of this equipment protection shields essentially serves the purposes of equipment preservation and promoting an effective lab environment within Building 10, Tenth Floor, B & N Corridor. SERVICE AGREEMENT: The contractor shall install the equipment protection shields within Building 10, Tenth Floor, B & N Corridor. Install and thoroughly test the shields to ensure they operate correctly. The contractor must carefully verify that the shields match the measurements specified for the equipment. This attention to detail guarantees proper fit and optimal performance of the shields, providing the necessary protection for the lab equipment.

    Key dates

    1. July 20, 2026Posted Date
    2. July 30, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    Installation of Custom Turtle Shell Equipment Protection Shields for Laboratory Equipment – Building 10, Tenth Floor B & N Corridor is a federal acquisition solicitation issued by DEPARTMENT OF HEALTH AND HUMAN SERVICES. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.