Closed Solicitation · DEPARTMENT OF VETERANS AFFAIRS

    J062--Amendment to Provide Q&A Replace street light pole concrete bases.

    DEPARTMENT OF VETERANS AFFAIRS
    Sol. 36C26326Q0712Combined Synopsis/SolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)Saint Paul, MN
    Closed
    STATUS
    Closed
    closed Jun 2, 2026
    POSTED
    May 28, 2026
    Publication date
    NAICS CODE
    238210
    Primary industry classification
    PSC CODE
    J062
    Product & service classification

    AI Summary

    The Department of Veterans Affairs is seeking contractors for the replacement of concrete bases for light poles, including painting and maintenance. This opportunity requires knowledge of concrete work and electrical services. Interested bidders should review the amendment for Q&A details and ensure compliance with specifications outlined in the solicitation.

    Contract details

    Solicitation No.
    36C26326Q0712
    Notice Type
    Combined Synopsis/Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    May 28, 2026
    Response Deadline
    June 2, 2026
    NAICS Code
    238210AI guide
    PSC / Class Code
    J062
    Contract Code
    3600
    Primary Contact
    Contract Specialist
    State
    MN
    ZIP Code
    55101
    AI Product/Service
    service

    Award information

    Awardee
    null
    Award Date

    Description

    5. PROJECT NUMBER (if applicable) CODE 7. ADMINISTERED BY 2. AMENDMENT/MODIFICATION NUMBER CODE 6. ISSUED BY 8. NAME AND ADDRESS OF CONTRACTOR 4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE 9A. AMENDMENT OF SOLICITATION NUMBER 9B. DATED PAGE OF PAGES 10A. MODIFICATION OF CONTRACT/ORDER NUMBER 10B. DATED BPA NO. 1. CONTRACT ID CODE FACILITY CODE CODE Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers E. IMPORTANT: is extended, (a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended. 12. ACCOUNTING AND APPROPRIATION DATA (REV. 11/2016) is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A. 15C. DATE SIGNED B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b). RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: D. OTHER Contractor 16C. DATE SIGNED 14. DESCRIPTION OF AMENDMENT/MODIFICATION 16B. UNITED STATES OF AMERICA Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect. 15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER 15B. CONTRACTOR/OFFEROR STANDARD FORM 30 PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.) (Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.) (If required) (SEE ITEM 11) (SEE ITEM 13) (X) CHECK ONE 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT (Signature of person authorized to sign) (Signature of Contracting Officer) 1 4 0002 05-28-2026 None 36C263 DEPARTMENT OF VETERANS AFFAIRS NETWORK CONTRACTING OFFICE 23 316 ROBERT STREET N, SUITE 506 SAINT PAUL MN 55101 36C263 DEPARTMENT OF VETERANS AFFAIRS NETWORK CONTRACTING OFFICE 23 316 ROBERT STREET N, SUITE 506 SAINT PAUL MN 55101 To all Offerors/Bidders 36C26326Q0712 X X X X 1 The purpose of the amendment is to provide answers to interested vendor questions. See continuation pages Curt LaRose Contracting Officer CONTINUATION PAGE Q1. There is a discrepancy in the SOW. On page 5 of the Solicitation, under New Light Pole concrete base, paragraph 1, it states that a 3/4 thick grounding rod is to be used. On page 6 of the Solicitation, under Material Components, paragraph 5, it states that a 5/8 thick grounding rod to be used. What is the size that you are asking to be used? A1. Answer: 5/8 thick grounding rod, as stated in the Material Components section, is the correct size. Q2. On light pole 1-10 there is an additional box attached to it. What s in the box and does it require special treatment? A2. Answer: The box contains chains to barricade the adjacent road if needed. No electricity in the box. Paint as needed. Q3. The Overview, paragraph 2, of the SOW states that there are approximately 31 light poles that require paint repair, not entire repaint. There are 26 poles that have the bases being replaced that are identified. Please confirm that those same 26 are the ones that require paint repair and identify the five (5) additional poles require this paint. A3. Answer: For the 26 poles receiving new concrete bases; re-paint/rust repair treatment shall be required for the entire pole (including its breakaway base), and re-stencil with its corresponding pole ID number. For the other 17 poles, affected by this project, but not receiving a new concrete base, they will be required to receive re-paint/rust repair treatment (touched up), where needed. Re-stencil with its corresponding pole ID number if necessary. Q4. To what extent must the poles be painted? Is the expectation to remove rust and flaking old paint and re-paint the entire pole? A4. Answer: Refer to the answer A3. Q5. It was stated at the site visit that there might be conduit in the poles that is metal and not PVC. The Solicitation states on page five (5) under the New Light Pole concrete base section in paragraph 2, Conduit installed and the conductors shall be the same size and type as the ones removed. Please confirm that you want these to be replaced with PVC conduit and that PVC is to be used on all. That wiring being replaced is to be the same size and type but will likely need to be longer than existing to accommodate the taller light pole bases. A5. Answer: Yes. PVC is to be the material to be used for the new concrete base conduits. Q6. Do you know how deep the current bases extend into the ground? A6. Answer: The current depth of the existing concrete bases is unknown. Q7. Can you identify what type of surface is around light poles that need to be replaced and how many of each type (Grass/lawn, Asphalt, Concrete, Gravel)? A7. Answer: The surface around the light poles is grass/lawn, except pole 113-8 which is asphalt pavement. Q8. Please confirm that work and updates to wiring within the light pole will be completed by the VA in the time that the pole is downed, while the old base is removed and the new base is being created & cured. A8. Answer: Yes. The VA will perform this work. Q9. Please confirm that all light poles and break-away bases are intended to be re-used. A9. Answer: Yes. All the light poles and break-away bases are intended to be re-used. Q10. To what extent is the contractor expected to restore the grass/lawn in the affected area? A10. Answer: The contractor is expected restore the surface around the pole with in kind materials. Q11. There is indicated 26 bases needing replacement and 31 poles to touch-up. Are the 31 poles in addition to the 26 base replacement count for a total of 57 poles? A11. Answer: Refer to the answer A3. Q12. The poles can be placed proximal to the removed bases. Can they be painted or touched up at that same location or moved to an on-site lay down area? A12. Answer: Yes. Q13. Will fencing be required at each base when performing work? Steel or orange fence? A13. Answer: Yes. An orange snow fence can be used. Q14. Will concrete testing be required? A14. Answer: Yes. The Contractor is required to do the concrete testing, as per your structural engineer of record recommendations. Q15. Will a structural engineer be required for the base construction? A 15. Answer: Yes. Q16. Bullet point a page 5 of the 41 page RFP indicates to re-pull conductors if in good condition . Does this mean some existing conductors be used at other locations? Or all conductors must be new? A16. Answer: All underground conductors should be replaced with new. Above ground conductors inside pole can be reused, if in good condition. Q17. If precast bases are employed are there any special tamping requirements? A17. Answer: This will be as per your structural engineer of record recommendations. Q18. There is no reference to a bid bond/bonds. Will these be required and if so, is there is magnitude for the overall project? A18. Answer: No bid bond/bonds. Q19. We would like to know if this is a brand new contract OR if there is (was) an incumbent performing these services. If not brand new, could you please provide the current / previous contract number? A19. Answer: This project is a new contract. Q20. We are looking to verify whether or not this RFQ is only to be bid on by SBE/DBE companies or if all responses will be considered. I am referring to small or disadvantaged businesses as the below statement is outlined on page 40 of the RFQ provided for this project. A20. Answer: This requirement is a Small Business Set-Aside. Q21. Could you kindly email me the list of GC bidders or plan holders for this project? Alternatively, if you could direct me to someone who would have this information, please let me know. A21. Answer: We do not have a list of G.C. bidders or plan holders for this project. Q22. We would like to know if this is a brand new contract OR if there is (was) an incumbent performing these services. If not brand new, could you please provide the current / previous contract number? A22. Answer: This is a new contract Provide answers to interested vendors questions

    Key dates

    1. May 28, 2026Posted Date
    2. June 2, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    J062--Amendment to Provide Q&A Replace street light pole concrete bases. is a federal contract award from DEPARTMENT OF VETERANS AFFAIRS. Review the award details including the awardee, contract value, and NAICS code.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.