Active Solicitation · DEPT OF DEFENSE

    JOHN DAY FISH PUMP REHABILITATION

    Sol. W9127N26BA001SolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)PORTLAND, OR
    Open · 20d remaining
    DAYS TO CLOSE
    20
    closes May 13, 2026
    POSTED
    Apr 22, 2026
    Publication date
    NAICS CODE
    237990
    Primary industry classification
    PSC CODE
    Z2KA
    Product & service classification

    AI Summary

    The U.S. Army Corps of Engineers is seeking contractors for the rehabilitation of fish pumps at John Day Dam, Oregon. This project involves the removal, refurbishment, and replacement of major components, including shafts and bearings, with a focus on precision machining and system testing. It is a Total Small Business Set-Aside, firm-fixed price contract.

    Contract details

    Solicitation No.
    W9127N26BA001
    Notice Type
    Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    April 22, 2026
    Response Deadline
    May 13, 2026
    NAICS Code
    237990AI guide
    PSC / Class Code
    Z2KA
    Issuing Office
    W071 ENDIST PORTLAND
    Primary Contact
    Kristel Flores
    State
    OR
    ZIP Code
    97204-3495
    AI Product/Service
    service

    Description

    W9127N26BA001 Amendment 0002 posted 22 April 2026

    W9127N26BA001 Amendment 0001 posted 9 April 2026

    ---------------------------------------------------

    The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for the John Day Fish Pump Rehabilitation at John Day Dam, Oregon. The proposed project will be a Total Small Business Set-Aside, firm-fixed price (FFP) contract.

    Background: Prior work on fish pump No.3 included replacement of the lower pump shaft, true-up machining of the upper pump shaft, true-up machining of the upper and lower bearing mounting flanges and spigot bores on the cover plate and diffuser, and true-up machining of the diffuser extension cone. The propeller itself had its blade tips built up with weld and re-machined a proper clearance (nominally 1/8" radial clearance) to the pit liner. In addition, the propeller center bores were true-up machined for proper fit (0.004-0.006" clearance) to the new lower shaft. The upper and lower bearings were fitted with greaseless bearing liners and the shafts existing stainless bearing journals were replaced with spares originally manufactured by Worthington Pump. work will be replicated for pump No.2 and possible pump No.1 and No. 3. 

    Purpose: The project will include the removal, refurbishment, and replacement of major components of Fish Pump Units 1, 2 and 3, including but not limited to shafts, bearings, bearing brackets, and right-angle drive gearboxes. Work will require field disassembly of existing equipment, transport of components for off-site shop repair, precision machining, fabrication of replacement parts, and final reinstallation and alignment to manufacturer specifications.

    The following information represents the project objectives:

    • Removal and replacement of damaged pump shafts and bearings.
    • Repair-by-replacement of approximately 1000 horsepower class power transmission and reduction gearbox.
    • Precision machining (true-up) of shafts, bearing housings, and diffuser components.
    • Installation of greaseless bearing liners and replacement of stainless-steel bearing journals.
    • On-site reassembly, shaft alignment, gearbox installation, and system balancing.
    • Testing of the completed pump unit(s) to verify functional performance.
    • Delivery of updated operation and maintenance manuals, drawings, and spare parts.

    Key dates

    1. April 22, 2026Posted Date
    2. May 13, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    JOHN DAY FISH PUMP REHABILITATION is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.