Closed Solicitation · DEPT OF DEFENSE

    Kansas City Levees UPRR Closure Structure

    Sol. W912DQ26RA035SolicitationKANSAS CITY, MO
    Closed
    STATUS
    Closed
    closed Apr 23, 2026
    POSTED
    Mar 18, 2026
    Publication date
    NAICS CODE
    237990
    Primary industry classification
    PSC CODE
    Y1LB
    Product & service classification

    AI Summary

    The Kansas City District of the US Army Corps of Engineers requires the construction of four closure structures for levee units on both sides of UPRR-owned bridges. This project includes stoplog fabrication, floodwall construction, and necessary approvals for construction activities. Bidders must be prepared for flagging operations and provide storage structures for stoplog components.

    Contract details

    Solicitation No.
    W912DQ26RA035
    Notice Type
    Solicitation
    Posted Date
    March 18, 2026
    Response Deadline
    April 23, 2026
    NAICS Code
    237990AI guide
    PSC / Class Code
    Y1LB
    Contract Code
    2100
    Primary Contact
    Myleesa France
    State
    MO
    ZIP Code
    64106-2896
    AI Product/Service
    both

    Description

    The Kansas City District, United States Army Corps of Engineers (USACE), has a need for the construction of four closure structures (two stoplog and two sandbag) located on both sides of two Union Pacific Railroad (UPRR)- owned bridges crossing the Armourdale (ARM; West side of the Kansas River) and Central Industrial District (CID; East side of the Kansas River) Levee Units. The south bridge (UPRR #3) contains two sets of railroad tracks: Mainline Track No. 1 and Mainline Track No. 2. The north bridge (MOPAC) contains two sets of railroad tracks: Track No. 3 and Track No. 202. Floodwalls are to be constructed to the north and the south of the closure structures and tie into existing floodwalls on the ARM side. Closure structures on the CID side connect to earthen levees. Stoplogs and all stoplog components need to be fabricated for the project, and once construction of the stoplog closure structures is complete, a test-fit of the stoplogs across Mainline Track No. 1 and Mainline Track No. 2 is required. To facilitate construction and test-fit of the stop logs, UPRR will require the approval of construction submittals, including a phasing plan, temporary shoring plans, and obtaining temporary track outages. Construction will require flagging operations for all activities within 25 feet of the track or if equipment has the potential to foul track. Stoplog storage structures to store all stoplog components also need to be provided on each levee unit.

    Key dates

    1. March 18, 2026Posted Date
    2. April 23, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    Kansas City Levees UPRR Closure Structure is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.