Closed Solicitation · DEPARTMENT OF ENERGY

    KAUTZ ROAD SUBSTATION REPLACEMENT PREFABRICATED CONTROL HOUSE BUILDING AND ASSOCIATED ARC SAFE 13.8KV MEDIUM VOLTAGE SWITCHGEAR

    DEPARTMENT OF ENERGY
    Sol. KRS-369604-JKSolicitationBatavia, IL
    Closed
    STATUS
    Closed
    closed Oct 14, 2025
    POSTED
    Sep 25, 2025
    Publication date
    NAICS CODE
    332311
    Primary industry classification
    PSC CODE
    3040
    Product & service classification

    AI Summary

    The Department of Energy is soliciting proposals for the Kautz Road Substation Replacement, which includes a prefabricated control house building and associated Arc Safe 13.8kV medium voltage switchgear. Proposals are due by 4pm CT on October 14, 2025. Interested subcontractors must provide all necessary labor, materials, and equipment as per the specifications and drawings provided.

    Contract details

    Solicitation No.
    KRS-369604-JK
    Notice Type
    Solicitation
    Posted Date
    September 25, 2025
    Response Deadline
    October 14, 2025
    NAICS Code
    332311AI guide
    PSC / Class Code
    3040
    Primary Contact
    Danielle Amico
    State
    IL
    ZIP Code
    60510
    AI Product/Service
    both

    Description

    On 9/25/25, Amendment 03 was issued to provide the attendance sheet from the pre-proposal meeting/site visit. The amendment also extends the questions due date and proposal due date. Questions are now due 4pm CT on September 29, 2025. Proposals are now due 4pm CT on October 14, 2025. See attached files for more information. 

    On 9/16/25, Amendment 02 was issued to provide responses to questions from prospective offerors and to add a site visit. The site visit will be held on Wednesday, September 24, 2025 at 10:30am CT. See attached files for more information. 

    On 9/8/25, Amendment 01 was issued to revise the Subcontractor Annual Representations & Certifications (SARC) form to Rev. 4 and to extend the questions due date and proposal due date. Questions are now due 4pm CT on September 16, 2025. Proposals are now due 4pm CT on October 6, 2025. See attached files for more information. 

    The selected Subcontractor shall provide all labor, materials, tools, equipment, and supervision required to provide the Kautz Road Substation Replacement Prefabricated Control House Building and associated Arc Safe 13.8kV Medium Voltage Switchgear, as delineated in the attached specification and drawings. The selected Subcontractor shall deliver the prefabricated control house building in compliance with all requirements in the specification and drawings documents, in accordance with the required quality assurance plan and subject to the specified acceptance criteria.

    Key dates

    1. September 25, 2025Posted Date
    2. October 14, 2025Proposals / Responses Due

    AI search tags

    Frequently asked questions

    KAUTZ ROAD SUBSTATION REPLACEMENT PREFABRICATED CONTROL HOUSE BUILDING AND ASSOCIATED ARC SAFE 13.8KV MEDIUM VOLTAGE SWITCHGEAR is a federal acquisition solicitation issued by DEPARTMENT OF ENERGY. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.