    The U.S. Department of Agriculture's Forest Service is soliciting bids for the replacement of a trail bridge on Trail 101, milepost 3.1, in the Lolo National Forest, Montana. The project involves removing the existing bridge, installing a new structure, and adjusting trail grades, with a completion deadline of October 15, 2026. The estimated construction cost is between $250,000 and $500,000, and bidders must provide a 20% bid bond.

    Contract details

    Solicitation No.
    1240LU25R0011
    Notice Type
    Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    June 20, 2025
    Response Deadline
    July 7, 2025
    NAICS Code
    237310AI guide
    PSC / Class Code
    Y1LB
    Issuing Office
    LOLO NATIONAL FOREST
    Sub-Agency
    FOREST SERVICE
    Primary Contact
    Alisha Knaub
    State
    MT
    ZIP Code
    59804

    Description

    PROJECT DESCRIPTION: The intent of the contract is to remove and replace an existing trail bridge and substructure elements on Trail 101, milepost 3.1 on the Ninemile Ranger District, Lolo National Forest, within the Great Burn ProposedWilderness. The structure is located in Section 19, Township 13 North, Range 25 West, Mineral County, Montana. The contractor is to furnish the replacement trail bridge structure and substructure.
    This project includes, but is not limited to, removing and disposing of the existing trail bridge and substructure elements, structural excavation and installation of foundation components, furnishing, loading, hauling and erecting the bridge, adjustment of adjacent  trail grades to match design plans, and all other incidental items necessary to complete the work according to the contract. This project is located within a proposed wilderness area therefore a list of Resource Protection Measures and Restricted Equipment is required for this project

    PROJECT LOCATION: The project can be accessed by traveling 37 miles west of Missoula on Interstate 90. Take the Fish Creek Exit #66. Follow Fish Creek Road #343 south to West Fork Fish Creek Road #7750. Follow Road #7750 to the end at Clearwater
    Crossing Campground. The project is located on Trail 101 at milepost 3.1.

    PERIOD OF PERFORMANCE: All work items must be completed by October 15, 2026. In-stream work is only permitted from July 15th to August 15th.

    MAGNITUDE OF CONSTRUCTION (per FAR 36.204(b)): Between $250,000 and $500,000.

    BONDING: All offerors will be required to provide a Bid Bond (20%) with their proposal submission. Performance and Payment Bonds (100% each) will be required of the successful awardee.

    QUESTION & ANSWERS:  Posted 6/20/2025

    Key dates

    1. June 20, 2025Posted Date
    2. July 7, 2025Proposals / Responses Due

    Frequently asked questions

    LOLO NATIONAL FOREST - UPPER WEST FORK FISH CREEK TRAIL BRIDGE REPLACEMENT is a federal acquisition solicitation issued by DEPARTMENT OF AGRICULTURE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.