Closed Solicitation · DEPT OF DEFENSE

    Longhouse Scenic Drive Rehabilitation Project ? Allegheny National Forest McKean and Warren Counties, Pennsylvania

    Sol. W911WN23B8007SolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)PITTSBURGH, PA
    Closed
    STATUS
    Closed
    closed Sep 26, 2023
    POSTED
    Aug 11, 2023
    Publication date
    NAICS CODE
    237310
    Primary industry classification
    PSC CODE
    Y1QA
    Product & service classification

    Contract details

    Solicitation No.
    W911WN23B8007
    Notice Type
    Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    August 11, 2023
    Response Deadline
    September 26, 2023
    NAICS Code
    237310AI guide
    PSC / Class Code
    Y1QA
    Contract Code
    2100
    Primary Contact
    CONNIE FERGUSON
    State
    PA
    ZIP Code
    15222-4198

    Award information

    Awardee
    null
    Award Date

    Description

    Longhouse Scenic Drive Rehabilitation Project ? Allegheny National Forest, McKean and Warren Counties, Pennsylvania. - The U.S. Army Corps of Engineers, Pittsburgh District, has a project on behalf of the USDA Forest Service, Allegheny National Forest, Bradford Ranger District, to rehabilitate Longhouse Scenic Drive (FR 262) within the Allegheny National Forest, in accordance with the scope of work contained in the Interagency Agreement (IA) originally executed in July 2021.This requirement has been divided into a Base Contract and three (3) Options. The Base Contract work consists of rehabilitating Longhouse Scenic Drive (FR 262) from Station 130+96 to Station 447+00, including but not limited to the following tasks: a. Complete work to repair the landslide. b. Remove and dispose the existing culvert conveying Dutchman Run and provide an Aquatic Organism Passage structure and stream simulation. c. Remove and dispose the existing culvert conveying Dewdrop Run and provide an Aquatic Organism Passage structure and stream simulation. d. Remove and dispose the existing culvert conveying Elijah Run and provide the proposed culvert. e. Remove and dispose the existing culvert conveying Trib 56529 to Dewdrop Run and provide the proposed culvert. f. Remove and dispose existing culverts and provide 18 inch, 24 inch, 30 inch, and 36 inch culverts. g. Remove and dispose existing culvert headwalls and provide culvert headwalls for 24 inch and 30 inch culverts. h. Remove and dispose existing CMP half-pipes and/or provide culvert outlet protection. i. Address defective guide rail elements. j. Remove and dispose existing guide rail delineators and provide new delineators. k. Execute asphalt pavement 1.5 inch mill and overlay. l. Execute full width full depth pavement replacement. m. Execute known and/or miscellaneous pavement spot repairs. n. Re-establish roadside ditches. o. Perform roadside brushing and tree trimming. p. Provide pavement markings. q. Remove and dispose existing sign and post systems and/or provide new sign and post systems, pertaining to trail crossing(s).r. Protection and maintenance of traffic during construction. The Option 1 work consists of rehabilitating Longhouse Scenic Drive (FR 262) from Station 0+00 to Station 130+96 and from Station 447+00 to Station 597+86.04, and rehabilitating Jakes Rocks Road (FR 492) from Station 0+00 to Station 0+50, including but not limited to the following tasks: a. Remove and dispose the existing culvert conveying Mead Eddy Run and provide the proposed culvert and culvert outlet protection. b. Remove and dispose existing culverts and provide 18 inch, 24 inch, 30 inch, 36 inch, and 48 inch culverts. c. Remove and dispose existing culverts and provide 65 inch x 40 inch Arch RCP Type B culverts. d. Remove and dispose existing culvert and provide 36.25 inch x 22.5 inch Arch RCP Type B culvert. e. Remove and dispose existing CMP half-pipes and/or provide culvert outlet protection. f. Address defective guide rail elements. g. Remove and dispose existing guide rail delineators and provide new delineators. h. Execute asphalt pavement 1.5 inch mill and overlay. i. Execute full width full depth pavement replacement .j. Execute known and/or miscellaneous pavement spot repairs. k. Execute shoulder treatments. l. Re-establish roadside ditches. m. Perform roadside brushing and tree trimming. n. Provide pavement markings. o. Remove and dispose existing sign and post systems and/or provide new sign and post systems, pertaining to trail crossing(s). p. Protection and maintenance of traffic during construction. The Option 2 work consists of removing and disposing existing sign and post systems and/or providing new sign and post systems along Longhouse Scenic Drive (FR 262), and associated protection and maintenance of traffic during construction. The Option 3 work consists of completing all work to construct proposed Vehicular Pull-Off Areas 1, 3, 6, 10, and 11 along Longhouse Scenic Drive (FR 262), and associated protection and maintenance of traffic during construction. *** NOTICE *** Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on ?View FFP Contract Changes Playbook Here?.

    Key dates

    1. August 11, 2023Posted Date
    2. September 26, 2023Proposals / Responses Due

    Frequently asked questions

    Longhouse Scenic Drive Rehabilitation Project ? Allegheny National Forest McKean and Warren Counties, Pennsylvania is a federal contract award from DEPT OF DEFENSE. Review the award details including the awardee, contract value, and NAICS code.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.